溪洛渡水电站地下厂房顶棚具有跨度大、质量要求高、工期紧、工序多、存在相互干扰和安全风险等特点,该工程采用施工台车,以拱形彩钢拱板作为混凝土浇筑的模板,加之相应的其他施工措施,成功地完成了施工任务,被评为溪洛渡水电站样板工程。
溪洛渡水電站地下廠房頂棚具有跨度大、質量要求高、工期緊、工序多、存在相互榦擾和安全風險等特點,該工程採用施工檯車,以拱形綵鋼拱闆作為混凝土澆築的模闆,加之相應的其他施工措施,成功地完成瞭施工任務,被評為溪洛渡水電站樣闆工程。
계락도수전참지하엄방정붕구유과도대、질량요구고、공기긴、공서다、존재상호간우화안전풍험등특점,해공정채용시공태차,이공형채강공판작위혼응토요축적모판,가지상응적기타시공조시,성공지완성료시공임무,피평위계락도수전참양판공정。
Construction of the ceiling surface for the underground powerhouse in Xiluodu hydropower station is of large span, strict requirement in construction quality , tight schedule , multiple procedures , mutual interference between con-struction procedures and high security risks , etc.Nevertheless, the construction work was successfully accomplished and even rated as a prototype project .In this paper , the construction techniques are introduced , including the application of construction trolley , arched steel plate as the template for concrete pouring , and some other corresponding construction measures.