结合雅砻江流域二滩、官地、锦屏一级、锦屏二级等水电站远离负荷中心的具体情况,分析归纳了机组并网正常进相运行的不利影响及应对措施,机组并网异常运行状态(发电机失磁运行、机组振荡)的特征及处理方法。
結閤雅礱江流域二灘、官地、錦屏一級、錦屏二級等水電站遠離負荷中心的具體情況,分析歸納瞭機組併網正常進相運行的不利影響及應對措施,機組併網異常運行狀態(髮電機失磁運行、機組振盪)的特徵及處理方法。
결합아롱강류역이탄、관지、금병일급、금병이급등수전참원리부하중심적구체정황,분석귀납료궤조병망정상진상운행적불리영향급응대조시,궤조병망이상운행상태(발전궤실자운행、궤조진탕)적특정급처리방법。
Considering the fact that the cascade power stations in Yalong River such as Ertan , Guandi, Jinping I and II hydropower stations are far from the load center , the adverse influence factors on the normal operation of the combined grid are analyzed, and emergency measures are presented .Then, characteristics of abnormal operation states such as ex-citation loss or surge of the generators are summarized and treatment measures are given .