在发展低碳经济的时代背景下,各类低碳要素的引入将对传统电源规划的内涵与模式带来深刻的变化。与此同时,碳捕集电厂和碳捕集预留电厂将成为未来电源规划的重要选项。将低碳要素引入电源规划决策之中,在充分考虑传统电力系统安全、经济运行要求的前提下,建立了含碳捕集电厂的低碳电源规划模型,重点在规划层面考虑了碳捕集技术的不同配置选项和发展路线,实现对碳捕集和碳捕集预留技术的建模。所提出的低碳电源规划模型本质上是一个统一协调的规划模型,统一考虑了规划中的投资决策问题与运行模拟问题。最后,以我国某省的实际数据构造算例,验证了所提出的模型与方法的合理性与有效性。
在髮展低碳經濟的時代揹景下,各類低碳要素的引入將對傳統電源規劃的內涵與模式帶來深刻的變化。與此同時,碳捕集電廠和碳捕集預留電廠將成為未來電源規劃的重要選項。將低碳要素引入電源規劃決策之中,在充分攷慮傳統電力繫統安全、經濟運行要求的前提下,建立瞭含碳捕集電廠的低碳電源規劃模型,重點在規劃層麵攷慮瞭碳捕集技術的不同配置選項和髮展路線,實現對碳捕集和碳捕集預留技術的建模。所提齣的低碳電源規劃模型本質上是一箇統一協調的規劃模型,統一攷慮瞭規劃中的投資決策問題與運行模擬問題。最後,以我國某省的實際數據構造算例,驗證瞭所提齣的模型與方法的閤理性與有效性。
재발전저탄경제적시대배경하,각류저탄요소적인입장대전통전원규화적내함여모식대래심각적변화。여차동시,탄포집전엄화탄포집예류전엄장성위미래전원규화적중요선항。장저탄요소인입전원규화결책지중,재충분고필전통전력계통안전、경제운행요구적전제하,건립료함탄포집전엄적저탄전원규화모형,중점재규화층면고필료탄포집기술적불동배치선항화발전로선,실현대탄포집화탄포집예류기술적건모。소제출적저탄전원규화모형본질상시일개통일협조적규화모형,통일고필료규화중적투자결책문제여운행모의문제。최후,이아국모성적실제수거구조산례,험증료소제출적모형여방법적합이성여유효성。
In the context of low-carbon economy, introducing various low-carbon factors will bring profound changes to both connotation and pattern of traditional generation expansion planning (GEP). Meanwhile the carbon capture power plant (CCPP) and carbon capture ready power plant (CCR) will be important options for GEP in the future. Incorporating low-carbon factors into GEP model and giving full consideration to the demands on secure and economic operation of traditional power grid, a low-carbon GEP model containing CCPP, in which different configuration options and development route of carbon capture technology are taken into serious consideration in the planning level, is established to implement the modeling of carbon capture and carbon capture ready technologies. In essence, the proposed low carbon GEP is a unified coordinated planning model, in which the investment decision-making and operation simulation in the planning are considered coordinately. Finally, effectiveness and validity of the proposed model and method are demonstrated by numerical case based on actual operating data of one province in China.