铜街子水电站12 F完成增容改造运行3个月后,机组在某些负荷段尾水管锥管部位出现异常撞击声,通过试验分析,找出了产生撞击声的原因,对尾水管损坏部位提出了修复措施,经修复后,取得了很好的效果。
銅街子水電站12 F完成增容改造運行3箇月後,機組在某些負荷段尾水管錐管部位齣現異常撞擊聲,通過試驗分析,找齣瞭產生撞擊聲的原因,對尾水管損壞部位提齣瞭脩複措施,經脩複後,取得瞭很好的效果。
동가자수전참12 F완성증용개조운행3개월후,궤조재모사부하단미수관추관부위출현이상당격성,통과시험분석,조출료산생당격성적원인,대미수관손배부위제출료수복조시,경수복후,취득료흔호적효과。
Abnormal clash in draft tube cone of some loaded-section was detected after 3-month operation of unit No .12 capacity increasement reformation finished in Tongjiezi Hydropower Station .Reasons for clash were found through exper-imental analysis and measures were carried out to repair draft tube .The repaired tube shows good performance .