南水北调与水利科技
南水北調與水利科技
남수북조여수리과기
SOUTH-TO-NORTH WATER
2013年
z2期
257-258,261
,共3页
渠道%衬砌%过程控制%要点
渠道%襯砌%過程控製%要點
거도%츤체%과정공제%요점
channel%lining%process control%points
选取南水北调邯石段元氏?标段为考察对象,着重从原材料进场质量控制、混凝土配合比以及混凝土施工过程中的细节控制3个方面探讨了南水北调渠道衬砌过程的控制要点。这不仅为当前的工程建设提供了技术保障,而且为以后工程建设提供经验和借鉴。
選取南水北調邯石段元氏?標段為攷察對象,著重從原材料進場質量控製、混凝土配閤比以及混凝土施工過程中的細節控製3箇方麵探討瞭南水北調渠道襯砌過程的控製要點。這不僅為噹前的工程建設提供瞭技術保障,而且為以後工程建設提供經驗和藉鑒。
선취남수북조함석단원씨?표단위고찰대상,착중종원재료진장질량공제、혼응토배합비이급혼응토시공과정중적세절공제3개방면탐토료남수북조거도츤체과정적공제요점。저불부위당전적공정건설제공료기술보장,이차위이후공정건설제공경험화차감。
Based on the practice of engineering construction of the first bid section at Yuanshi County from Handan to Shijiazhang in the South-to-North Water Diversion Project, from the aspects of quality control of raw materials, the proportion of concrete mix and the details control in concrete construction process, the paper illustrates the control points on the channel lining process. T his not only provides technical support for the engineering construction, but also provides experience and reference for the future engineering construction.