SOUTH-TO-NORTH WATER
2013年
z2期
160-162
,共3页
陈亚军%张洋%姜成启%耿亮%张亚%李欣%苏慧
陳亞軍%張洋%薑成啟%耿亮%張亞%李訢%囌慧
진아군%장양%강성계%경량%장아%리흔%소혜
南水北调%睢宁二站%肘型进水流道%虹吸出水流道%块基型结构%结构设计%深基坑
南水北調%睢寧二站%肘型進水流道%虹吸齣水流道%塊基型結構%結構設計%深基坑
남수북조%휴저이참%주형진수류도%홍흡출수류도%괴기형결구%결구설계%심기갱
the South-to-North Water Transfer%the Suining pump station ò%elbow-shaped inlet passage%siphon outlet conduit%block-based structure%structur al design%deep excavation
睢宁二站是南水北调东线第五级泵站,是以调水为主,兼有农业灌溉、航运、排涝和防洪等综合性能的大型泵站,是南水北调东线建筑物中地震烈度最高、扬程最高、基坑最深、单块底板面积较大的泵站。该泵站结构采用肘型进水流道、虹吸式出水流道的块基型结构,采用真空破坏阀断流。现着重从泵站结构布置、侧向抗滑稳定措施、结构计算方法、裂缝控制、基坑支护等方面进行结构计算、设计。该泵站计算方法对类似工程具有一定的参考价值。
睢寧二站是南水北調東線第五級泵站,是以調水為主,兼有農業灌溉、航運、排澇和防洪等綜閤性能的大型泵站,是南水北調東線建築物中地震烈度最高、颺程最高、基坑最深、單塊底闆麵積較大的泵站。該泵站結構採用肘型進水流道、虹吸式齣水流道的塊基型結構,採用真空破壞閥斷流。現著重從泵站結構佈置、側嚮抗滑穩定措施、結構計算方法、裂縫控製、基坑支護等方麵進行結構計算、設計。該泵站計算方法對類似工程具有一定的參攷價值。
휴저이참시남수북조동선제오급빙참,시이조수위주,겸유농업관개、항운、배로화방홍등종합성능적대형빙참,시남수북조동선건축물중지진열도최고、양정최고、기갱최심、단괴저판면적교대적빙참。해빙참결구채용주형진수류도、홍흡식출수류도적괴기형결구,채용진공파배벌단류。현착중종빙참결구포치、측향항활은정조시、결구계산방법、렬봉공제、기갱지호등방면진행결구계산、설계。해빙참계산방법대유사공정구유일정적삼고개치。
Suining pump station ò is the fifth stage lift water cascade station along the Eastern Route of the South-to-North Water T ransfers. The project is a comprehensive hydropower project as water diversion is its main purpose and combining irrigation, shipping, and flood and wa-terlogging control. It is the pump station with the highest earthquake intensity, the highest lift head, the deepest foundation pit, larger block of singlefloorareaofthebuildingsalongtheEasternRoute.Theblock-basedstructureinthepumpstationiswiththeelbow-shapedinletpassage and siphon outlet conduit. The vacuum-breaking valve is applied in the station. T he paper has calculated and designed based on the aspects of structural arrangement, measures of lateral stability, structural calculation and analysis, limiting cracks, retaining and protection of foundation pitsofthepumpingstation.Theanalysiscanbeareferencetothestructuralreinforceddesigninthesimilartypeoflarge-scaleblock-basedpum-ping stations.