石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2013年
5期
84-87
,共4页
赵修太%付敏杰%王增宝%任熵%陈东明
趙脩太%付敏傑%王增寶%任熵%陳東明
조수태%부민걸%왕증보%임적%진동명
次生大孔道%精细调堵%可视化模拟%平板模型%封堵规律
次生大孔道%精細調堵%可視化模擬%平闆模型%封堵規律
차생대공도%정세조도%가시화모의%평판모형%봉도규률
secondary porous channels%ifne proifle control and water plugging%visualized simulation%platelike models%regulations
长时间高强度注水开发导致疏松砂岩油藏形成次生大孔道,注入水无效循环,严重影响原油采收率。为此,研究了不同条件下堵剂的封堵规律,开展了精细调堵可视化模拟实验研究。研究结果表明:理论上,等剂量堵剂封堵深度越大波及系数越高,应致力于研发低成本深部调驱体系;剩余油分布对调堵作业效果具有重要影响,若剩余油集中在油井附近,则应进行深部堵水;而剩余油富集在水井附近,则应适当进行近井调剖;堵剂投放量存在一个经济限度,实验条件下封堵段塞长度为井距的10%左右时,封堵时效果最佳,且二次调堵效果优于一次调堵;对于弯曲大孔道地层,应尽可能在弯曲后段的远井地带进行封堵,以充分发挥大孔道高导流能力和井口附近高压力降的协同作用机理。
長時間高彊度註水開髮導緻疏鬆砂巖油藏形成次生大孔道,註入水無效循環,嚴重影響原油採收率。為此,研究瞭不同條件下堵劑的封堵規律,開展瞭精細調堵可視化模擬實驗研究。研究結果錶明:理論上,等劑量堵劑封堵深度越大波及繫數越高,應緻力于研髮低成本深部調驅體繫;剩餘油分佈對調堵作業效果具有重要影響,若剩餘油集中在油井附近,則應進行深部堵水;而剩餘油富集在水井附近,則應適噹進行近井調剖;堵劑投放量存在一箇經濟限度,實驗條件下封堵段塞長度為井距的10%左右時,封堵時效果最佳,且二次調堵效果優于一次調堵;對于彎麯大孔道地層,應儘可能在彎麯後段的遠井地帶進行封堵,以充分髮揮大孔道高導流能力和井口附近高壓力降的協同作用機理。
장시간고강도주수개발도치소송사암유장형성차생대공도,주입수무효순배,엄중영향원유채수솔。위차,연구료불동조건하도제적봉도규률,개전료정세조도가시화모의실험연구。연구결과표명:이론상,등제량도제봉도심도월대파급계수월고,응치력우연발저성본심부조구체계;잉여유분포대조도작업효과구유중요영향,약잉여유집중재유정부근,칙응진행심부도수;이잉여유부집재수정부근,칙응괄당진행근정조부;도제투방량존재일개경제한도,실험조건하봉도단새장도위정거적10%좌우시,봉도시효과최가,차이차조도효과우우일차조도;대우만곡대공도지층,응진가능재만곡후단적원정지대진행봉도,이충분발휘대공도고도류능력화정구부근고압력강적협동작용궤리。
Secondary porous channels are formed due to the long time forced water-lfooding in unconsolidated sandstone reser-voirs, which lead to the invalid circle of injected water and low oil recovery. Research on regular patterns of proifle control and water plugging has great signiifcance for ifeld production. With the visualized simulation experiments, process of the improvement of sweep efifciency could be much more intuitive and concrete. The results showed that:sweep efifciency would be higher with the deeper loca-tion in theory, which needed the support of plugging agents with high lfow capacity and low price;Results of the plugging operations depend on the distribution of remaining oil, plugging agents should be put deeper, if remaining oil was near production well;while this distance should not be so long with remaining oil near injection well;An economic limit was existed for the injection volume of plugging agents, which is about 10 percent under the condition of experiments, and injection twice showed a much better results. For reservoirs with bending channels, areas after the corner and far away from the wells were proved to be a good place to locate the plugging agents, which could make a full use of the high conductivity of porous channels and high pressure drop near wells.