中国医学装备
中國醫學裝備
중국의학장비
CHINA MEDICAL EQUIPMENT
2013年
10期
53-54,55
,共3页
核磁共振设备机房%环境要求%施工准备
覈磁共振設備機房%環境要求%施工準備
핵자공진설비궤방%배경요구%시공준비
Nuclear magnetic resonance equipment room%Environmental requirements%Preparation for construction
目的:通过对3.0T核磁共振设备机房施工前期的合理布局、充分准备,缩短了施工时间,使得后期使用安全便捷,为医院节约了资金。方法:根据医院具体特点,在选址时充分考虑运输、配电、通风、承重及电磁干扰等问题,逐步进行落实、做好施工准备。结果:机房选址要求承重在10t以上、磁体中心点3 m内铁磁物质要做评估,周围移动的汽车及变压器必须在3G线以外,要求有专用变压器且容量>150 kVA。设备接地电阻<2Ω,屏蔽房对地绝缘>1000Ω。失超管高出地面3.8 m以上,周围不能有空调进风口。水冷机通风良好,北方地区还要做好室外机的冬季防冻。磁体间排风按每小时换气≥12次设计。结论:医院大型设备施工准备及辅助设备安装过程中的各个环节要匹配合理,同时注重和不同单位之间的协作。合理的设备布局和施工准备,是设备顺利安装的保证。
目的:通過對3.0T覈磁共振設備機房施工前期的閤理佈跼、充分準備,縮短瞭施工時間,使得後期使用安全便捷,為醫院節約瞭資金。方法:根據醫院具體特點,在選阯時充分攷慮運輸、配電、通風、承重及電磁榦擾等問題,逐步進行落實、做好施工準備。結果:機房選阯要求承重在10t以上、磁體中心點3 m內鐵磁物質要做評估,週圍移動的汽車及變壓器必鬚在3G線以外,要求有專用變壓器且容量>150 kVA。設備接地電阻<2Ω,屏蔽房對地絕緣>1000Ω。失超管高齣地麵3.8 m以上,週圍不能有空調進風口。水冷機通風良好,北方地區還要做好室外機的鼕季防凍。磁體間排風按每小時換氣≥12次設計。結論:醫院大型設備施工準備及輔助設備安裝過程中的各箇環節要匹配閤理,同時註重和不同單位之間的協作。閤理的設備佈跼和施工準備,是設備順利安裝的保證。
목적:통과대3.0T핵자공진설비궤방시공전기적합리포국、충분준비,축단료시공시간,사득후기사용안전편첩,위의원절약료자금。방법:근거의원구체특점,재선지시충분고필운수、배전、통풍、승중급전자간우등문제,축보진행락실、주호시공준비。결과:궤방선지요구승중재10t이상、자체중심점3 m내철자물질요주평고,주위이동적기차급변압기필수재3G선이외,요구유전용변압기차용량>150 kVA。설비접지전조<2Ω,병폐방대지절연>1000Ω。실초관고출지면3.8 m이상,주위불능유공조진풍구。수랭궤통풍량호,북방지구환요주호실외궤적동계방동。자체간배풍안매소시환기≥12차설계。결론:의원대형설비시공준비급보조설비안장과정중적각개배절요필배합리,동시주중화불동단위지간적협작。합리적설비포국화시공준비,시설비순리안장적보증。
Objective:To do the research on the layout and construction preparation for 3.0T high-field nuclear magnetic resonance equipment room, greatly shorten the construction time and save money for hospital by the safe and convenient usage. Methods: According to the specific characteristics of hospital sitting in full consideration of transportation and distribution, ventilation, bearing, electromagnetic interference and so on, we implement gradually, were ready to work in the construction. Results: Computer room location requirements bearing within 10 tons, magnets, center of 3 m in ferromagnetic material to do assessment, and moving around the car and the transformer must be beyond 3G line, required a special transformer and the capacity of more than 150 kVA. Equipment grounding resistance is less than 2 ohms, shielding room of insulation is greater than 1000 ohms. Super tube is higher than 3.8 m above the ground, there be no air conditioning air inlet. Water-cooled machine well ventilated, northern region need to get the winter outdoor antifreeze. Exhaust air change per hour between magnet design of not less than 12 times. Conclusion: Hospital construction for large equipment and ancillary equipment is installed in the process of each link to match reasonably, pay attention to the collaboration between different units and at the same time. Reasonable equipment layout and construction preparation is the guarantee of equipment installation smoothly.