现代制造工程
現代製造工程
현대제조공정
MODERN MANUFACTURING ENGINEERING
2014年
5期
103-108
,共6页
溢流阀%压力%流量%静态特性%动态特性
溢流閥%壓力%流量%靜態特性%動態特性
일류벌%압력%류량%정태특성%동태특성
relief valve%pressure%flow%static characteristics%dynamic characteristics
为测试铝合金液压阀岛溢流阀的静、动双态特性是否满足使用要求,根据铝合金液压阀岛系统结构及工作原理,在分析其试验要求的基础上建立了相应的静、动双态特性试验测试平台。通过对阀岛溢流阀的静、动双态特性的主要性能指标进行测试,得出相关结论。静态特性测试结果表明:被测溢流阀的调压范围符合技术要求,压力振摆较小,且压力偏移值在允许范围内;在额定压力下,流量较低时,被测溢流阀可得到更好的启闭特性。动态测试结果表明:被测溢流阀的压力超调率与试验流量和溢流阀的进口压力有关;试验流量和溢流阀的进口压力增大,被测溢流阀的压力超调量会增加;当改变被测溢流阀的试验流量和溢流阀的进口压力时,被测溢流阀的压力上升时间及压力调整时间均随之变化。
為測試鋁閤金液壓閥島溢流閥的靜、動雙態特性是否滿足使用要求,根據鋁閤金液壓閥島繫統結構及工作原理,在分析其試驗要求的基礎上建立瞭相應的靜、動雙態特性試驗測試平檯。通過對閥島溢流閥的靜、動雙態特性的主要性能指標進行測試,得齣相關結論。靜態特性測試結果錶明:被測溢流閥的調壓範圍符閤技術要求,壓力振襬較小,且壓力偏移值在允許範圍內;在額定壓力下,流量較低時,被測溢流閥可得到更好的啟閉特性。動態測試結果錶明:被測溢流閥的壓力超調率與試驗流量和溢流閥的進口壓力有關;試驗流量和溢流閥的進口壓力增大,被測溢流閥的壓力超調量會增加;噹改變被測溢流閥的試驗流量和溢流閥的進口壓力時,被測溢流閥的壓力上升時間及壓力調整時間均隨之變化。
위측시려합금액압벌도일류벌적정、동쌍태특성시부만족사용요구,근거려합금액압벌도계통결구급공작원리,재분석기시험요구적기출상건립료상응적정、동쌍태특성시험측시평태。통과대벌도일류벌적정、동쌍태특성적주요성능지표진행측시,득출상관결론。정태특성측시결과표명:피측일류벌적조압범위부합기술요구,압력진파교소,차압력편이치재윤허범위내;재액정압력하,류량교저시,피측일류벌가득도경호적계폐특성。동태측시결과표명:피측일류벌적압력초조솔여시험류량화일류벌적진구압력유관;시험류량화일류벌적진구압력증대,피측일류벌적압력초조량회증가;당개변피측일류벌적시험류량화일류벌적진구압력시,피측일류벌적압력상승시간급압력조정시간균수지변화。
In order to test whether the static and dynamic double-state characteristics performances of the hydraulic valve terminal of aluminum-alloy can meet its demands or not .According to its structural and working principle ,the static and dynamic double-state characteristics test system platform was established based on analyzing its experimental demands .And drew the relevant test results after the relief valve double-state characteristics were test .The static characteristics results indicated that the relief valve meets the technical requirements ,the regulating vibration pressure is small ,and the offset value is in the permitted range .Under the rated pressure condition ,if the flow rate is low ,the relief valve can get better on-off characteristic .The dynamic characteristics test results showed that the pressure overshoot only has relationship with the test flow ,and has not with the setting pressure .The pressure overshoot will increase and the pressure debug time will decrease with the test flow increases ,but the respond speed will be improved.The pressure rise time and the pressure adjust time of the relief valve will be both changed with the test flow .