工程地质%膨胀岩土%滑坡%治理措施
工程地質%膨脹巖土%滑坡%治理措施
공정지질%팽창암토%활파%치리조시
engineering geology%swelling rock and soil%landslide%treatment measures
我国工程建设大规模的开展和极端气候影响导致膨胀岩土滑坡问题越来越多,而现有相关规范尚不能满足膨胀岩土滑坡治理工程的要求。收集广西44个膨胀岩土滑坡治理工程资料,先对3个典型的滑坡治理工程进行剖析并分析成败原因,指出滑动面和抗剪强度的合理确定是膨胀岩土滑坡治理成败的关键;然后统计分析广西膨胀岩土抗剪强度指标、地基水平抗力系数和岩层与砂浆的黏结强度;最后提出常规方法治理膨胀岩土滑坡应注重的技术要点:必须设置截排水系统且应满足相关膨胀土规范要求;削方减载在永久治理工程中应慎用;挡土墙设计应满足相关膨胀土规范要求且高度不宜超过3m;抗滑桩锚固段需超过大气影响深度,成孔时应减少水对桩周岩土的软化;锚杆(索)支护应慎用,锚固段应超过大气影响深度,成孔必须干作业。
我國工程建設大規模的開展和極耑氣候影響導緻膨脹巖土滑坡問題越來越多,而現有相關規範尚不能滿足膨脹巖土滑坡治理工程的要求。收集廣西44箇膨脹巖土滑坡治理工程資料,先對3箇典型的滑坡治理工程進行剖析併分析成敗原因,指齣滑動麵和抗剪彊度的閤理確定是膨脹巖土滑坡治理成敗的關鍵;然後統計分析廣西膨脹巖土抗剪彊度指標、地基水平抗力繫數和巖層與砂漿的黏結彊度;最後提齣常規方法治理膨脹巖土滑坡應註重的技術要點:必鬚設置截排水繫統且應滿足相關膨脹土規範要求;削方減載在永久治理工程中應慎用;擋土牆設計應滿足相關膨脹土規範要求且高度不宜超過3m;抗滑樁錨固段需超過大氣影響深度,成孔時應減少水對樁週巖土的軟化;錨桿(索)支護應慎用,錨固段應超過大氣影響深度,成孔必鬚榦作業。
아국공정건설대규모적개전화겁단기후영향도치팽창암토활파문제월래월다,이현유상관규범상불능만족팽창암토활파치리공정적요구。수집엄서44개팽창암토활파치리공정자료,선대3개전형적활파치리공정진행부석병분석성패원인,지출활동면화항전강도적합리학정시팽창암토활파치리성패적관건;연후통계분석엄서팽창암토항전강도지표、지기수평항력계수화암층여사장적점결강도;최후제출상규방법치리팽창암토활파응주중적기술요점:필수설치절배수계통차응만족상관팽창토규범요구;삭방감재재영구치리공정중응신용;당토장설계응만족상관팽창토규범요구차고도불의초과3m;항활장묘고단수초과대기영향심도,성공시응감소수대장주암토적연화;묘간(색)지호응신용,묘고단응초과대기영향심도,성공필수간작업。
As the large-scale development of engineering construction and extreme weather in Chian,numbers of swelling rock and soil landslide problem happened,but the related codes can't satisfy the requirement of swelling rock and soil landslide treatment. 44 engineering cases of swelling rock and soil landslide treatment are collected, firstly analyzing the success or failure reason to the three typical landslide treatment engineerings,pointing out that the reasonable determination of the sliding surface and shear strength are crucial to the swelling rock and soil landslide treatment;secondly statistical analyzing the shear strength index for swelling rock and soil of Guangxi, the foundation horizontal resistance coefficient and bonding strength within mudstone and mortar;finally putting forward the special rules of the conventional method used in swelling rock and soil landslide treatment:must setting up drainage system and should meet the codes for expansive soil;cutting and shedding load used in the permanent treatment should be careful;the designing of retaining wall should meet the codes for expansive soil, and should not be more than 3 meters height;the anchorage segment of anti-slide pile should be more than the influence depth of atmosphere,reducing softening by water to the rock and soil around pile when boring;the use of anchor supporting should be careful,and the anchorage segment should be more than the influence depth of atmosphere,hole should be dry-bored.