岩石力学与工程学报
巖石力學與工程學報
암석역학여공정학보
CHINESE JOURNAL OF ROCK MECHANICS AND ENGINEERING
2013年
z2期
3610-3618
,共9页
白浪峰%徐前卫%田龙岗%段群苗
白浪峰%徐前衛%田龍崗%段群苗
백랑봉%서전위%전룡강%단군묘
隧道工程%连拱隧道%模型试验%数值模拟%松动区
隧道工程%連拱隧道%模型試驗%數值模擬%鬆動區
수도공정%련공수도%모형시험%수치모의%송동구
tunnelling engineering%multi-arch tunnel%model test%numerical simulation%loose zone
工程中连拱隧道围岩松动范围的确定对采取合理的支护手段和方法具有重要的理论价值和实际意义。以埋深100 m的公路连拱隧道为研究对象,利用室内模型试验,对软弱破碎围岩松动区的发展过程及范围进行研究,并采用压力盒量测围岩不同部位的应力,分析围岩松动区的应力场特征。利用FLAC软件对模型试验进行数值模拟,通过应力分析法和极限拉应变法判别松动区范围,并与模型试验结果进行对比分析,发现松动区内围岩切向应力大于径向应力,深埋条件下围岩更容易形成压力拱,应力分析法所得的松动区与模型试验结果更为接近,建议深埋隧道采用应力分析法判断松动区范围。
工程中連拱隧道圍巖鬆動範圍的確定對採取閤理的支護手段和方法具有重要的理論價值和實際意義。以埋深100 m的公路連拱隧道為研究對象,利用室內模型試驗,對軟弱破碎圍巖鬆動區的髮展過程及範圍進行研究,併採用壓力盒量測圍巖不同部位的應力,分析圍巖鬆動區的應力場特徵。利用FLAC軟件對模型試驗進行數值模擬,通過應力分析法和極限拉應變法判彆鬆動區範圍,併與模型試驗結果進行對比分析,髮現鬆動區內圍巖切嚮應力大于徑嚮應力,深埋條件下圍巖更容易形成壓力拱,應力分析法所得的鬆動區與模型試驗結果更為接近,建議深埋隧道採用應力分析法判斷鬆動區範圍。
공정중련공수도위암송동범위적학정대채취합리적지호수단화방법구유중요적이론개치화실제의의。이매심100 m적공로련공수도위연구대상,이용실내모형시험,대연약파쇄위암송동구적발전과정급범위진행연구,병채용압력합량측위암불동부위적응력,분석위암송동구적응력장특정。이용FLAC연건대모형시험진행수치모의,통과응력분석법화겁한랍응변법판별송동구범위,병여모형시험결과진행대비분석,발현송동구내위암절향응력대우경향응력,심매조건하위암경용역형성압력공,응력분석법소득적송동구여모형시험결과경위접근,건의심매수도채용응력분석법판단송동구범위。
In the field of multi-arch tunnel,determining loose zone of surrounding rock has important theoretical value and practical significance for taking appropriate method for support in actual projects. By taking highway multi-arch tunnel with overburden depths of 100 m for example,a model test based on similar principle is implemented to study loose zone of the soft and fractured surrounding rock,and the characteristics of stress field in loose zone are analyzed through measuring pressure of different locations by pressure cells. FLAC software is applied to simulate model test. The range of loose zone is identified by stress analysis method and ultimate tensile strain method. Comparing with results of model test shows that tangential stress is greater than radius stress in loose zone,surrounding rock is more likely to form pressure arch under deep overburden condition. The range of loose zone decided by stress analysis method is closer to the results of model test,identifying loose zone is feasible for deep overburden tunnel by stress analysis method.