船海工程
船海工程
선해공정
SHIP & OCEAN ENGINEERING
2014年
2期
109-113
,共5页
深水安装%电缆和脐带缆%转盘%张紧器
深水安裝%電纜和臍帶纜%轉盤%張緊器
심수안장%전람화제대람%전반%장긴기
deep-water installation%power cable and umbilical%carousel%tensioner
介绍流花4-1油田电缆和脐带缆的形式、铺设过程及铺设施工中需要的主要设备、安装过程技术参数及限制条件,为国内其它项目的海缆安装及深水油田的开发提供借鉴。
介紹流花4-1油田電纜和臍帶纜的形式、鋪設過程及鋪設施工中需要的主要設備、安裝過程技術參數及限製條件,為國內其它項目的海纜安裝及深水油田的開髮提供藉鑒。
개소류화4-1유전전람화제대람적형식、포설과정급포설시공중수요적주요설비、안장과정기술삼수급한제조건,위국내기타항목적해람안장급심수유전적개발제공차감。
The configuration of the power cable and umbilical for Liuhua 4-1 oil field was introduced , as well as the main e-quipments , process control parameters and limitations for offshore installation .It can provide reference to the deep-water installa-tion of other projects and the development of deep-water oil and gas fields in the South China sea .