为了解决多煤层开采下伏工作面煤柱逐渐增大的问题,以四台矿14号煤层311盘区81105面为对象,利用极限平衡理论,计算得12号煤层开采对底板的最大破坏深度2.74 m,距巷帮水平距离1.85 m,使14号煤层51105巷顶板保留了足够岩层,且释放顶板上部分应力,保障了14号煤层81105面的零内错布置实施;通过钢带锚杆的支护,14号煤层51105巷顶板表面最大拉应力承载能力达到51.7 MPa,远大于超前支承压力时的拉应力承受值,验证了巷道支护的可靠性。工程结果表明,掘进中巷道顶板没有发现明显变形,最大下沉量仅18.3 mm,并因采用零内错布置,仅81105面就可多采原煤20592 t,取得了较大的经济效益和社会效益。
為瞭解決多煤層開採下伏工作麵煤柱逐漸增大的問題,以四檯礦14號煤層311盤區81105麵為對象,利用極限平衡理論,計算得12號煤層開採對底闆的最大破壞深度2.74 m,距巷幫水平距離1.85 m,使14號煤層51105巷頂闆保留瞭足夠巖層,且釋放頂闆上部分應力,保障瞭14號煤層81105麵的零內錯佈置實施;通過鋼帶錨桿的支護,14號煤層51105巷頂闆錶麵最大拉應力承載能力達到51.7 MPa,遠大于超前支承壓力時的拉應力承受值,驗證瞭巷道支護的可靠性。工程結果錶明,掘進中巷道頂闆沒有髮現明顯變形,最大下沉量僅18.3 mm,併因採用零內錯佈置,僅81105麵就可多採原煤20592 t,取得瞭較大的經濟效益和社會效益。
위료해결다매층개채하복공작면매주축점증대적문제,이사태광14호매층311반구81105면위대상,이용겁한평형이론,계산득12호매층개채대저판적최대파배심도2.74 m,거항방수평거리1.85 m,사14호매층51105항정판보류료족구암층,차석방정판상부분응력,보장료14호매층81105면적령내착포치실시;통과강대묘간적지호,14호매층51105항정판표면최대랍응력승재능력체도51.7 MPa,원대우초전지승압력시적랍응력승수치,험증료항도지호적가고성。공정결과표명,굴진중항도정판몰유발현명현변형,최대하침량부18.3 mm,병인채용령내착포치,부81105면취가다채원매20592 t,취득료교대적경제효익화사회효익。
To solve the gradual increase of coal pillars in underlying roadways of multiple seams mining, on the mining face 81105, panel 311, seam 14 in Sitai Mine, limit equilibrium theory was used to work out the maximum damage depth of 2.74m on floor in seam 12 mining and horizontal distance of 1.85m to roadway walls. Sufficient rock stratum was retained for the roof of roadway 51105 of seam 14 and the stress above the roof was released, so that zero-inboard-type layout was ensured for the mining face 81105 of seam 14. With steel belt anchor supporting, the maximum bearing capacity of tensile stress reached to 51.7MPa, which was far more than the value of advanced abutment pressure. This proved the reliability of the roadway support. The engineering results showed that there was no obvious deformation of the roof in the driving roadway with the maximum subsidence 18.3mm. In addition, the zero-inboard-type layout led to mine out 20 592 t more coal only on the 81155 mining face, which has achieved ideal economic and social benefits.