储煤基地配套设施多,供电负荷较大,为确保项目的顺利实施,首先要确定场区的供电方案,以便对供电设备进行调研、安装,保证供电可靠、经济运行。
儲煤基地配套設施多,供電負荷較大,為確保項目的順利實施,首先要確定場區的供電方案,以便對供電設備進行調研、安裝,保證供電可靠、經濟運行。
저매기지배투설시다,공전부하교대,위학보항목적순리실시,수선요학정장구적공전방안,이편대공전설비진행조연、안장,보증공전가고、경제운행。
Many supporting facility and the huge power supply load in the coal storage base makes the design of power supply difficult, in order to ensure the smooth implementation of the project, first to determine the power supply scheme ifeld, in order to supply equipment for research, installation, ensure reliable power supply, economic operation.