经对浩然煤矿井田开拓方案的技术经济比较,开拓采用方案一:改造利用原平大万梁煤业现有主斜井、副斜井和回风斜井,首采区布置于2号煤层内,全矿井共布置1个+1295 m水平面,7个采区。方案一比方案二少投资1211万元。
經對浩然煤礦井田開拓方案的技術經濟比較,開拓採用方案一:改造利用原平大萬樑煤業現有主斜井、副斜井和迴風斜井,首採區佈置于2號煤層內,全礦井共佈置1箇+1295 m水平麵,7箇採區。方案一比方案二少投資1211萬元。
경대호연매광정전개탁방안적기술경제비교,개탁채용방안일:개조이용원평대만량매업현유주사정、부사정화회풍사정,수채구포치우2호매층내,전광정공포치1개+1295 m수평면,7개채구。방안일비방안이소투자1211만원。
By techno-economic comparison of mine field development, the plan one was adopted in Haoran Mine: transforming the current main inclined shaft, auxiliary inclined shaft and return-air inclined shaft of Dawanliang Coal Co., Yuanping. The first mining area was located in the No.2 coal seam, with one +1297m horizontal level and seven mining areas altogether in the whole mine. The investment of the plan one is less than that of the plan two by 12.11 million yuan.