水电与新能源
水電與新能源
수전여신능원
HYDROPOWER AND NEW ENERGY
2014年
3期
51-52
,共2页
官地水电站%技术供水%排污排漂
官地水電站%技術供水%排汙排漂
관지수전참%기술공수%배오배표
Guandi hydropower station%technical water supply%drifts
官地水电站发电初期,1号机技术供水系统被漂浮物堵塞,机组冷却水量严重不足,影响安全运行。介绍了临时应急措施,并建议寻求从根本上解决此问题的途径。
官地水電站髮電初期,1號機技術供水繫統被漂浮物堵塞,機組冷卻水量嚴重不足,影響安全運行。介紹瞭臨時應急措施,併建議尋求從根本上解決此問題的途徑。
관지수전참발전초기,1호궤기술공수계통피표부물도새,궤조냉각수량엄중불족,영향안전운행。개소료림시응급조시,병건의심구종근본상해결차문제적도경。
In the early operation stage of Guandi hydropower station , the technical water supply system for the No .1 generator set was blocked by drifts .Consequently , the supply of cooling water for the generator was seriously insuffi-cient, which jeopardize the operation safety of the station .Temporary emergency measures are presented and suggestion is made that such problem can be solved only in fundamental ways .