针对八一煤矿转入深部开采存在的通风阻力大,供风量不足和采掘工作面温度高等问题,开展了矿井通风技术测定.结果表明矿井实际供风量为62 m3/s,低于需风量100 m3/s,供风严重不足,且通风总阻力为2712 Pa已接近矿井通风阻力上限.通风系统中进风段、用风段和回风段阻力比例为2∶1∶11.8,阻力分布不合理.根据矿井通风容易和困难时期的生产部署和配风情况,提出2方面的技术措施:一方面通过启用并联风巷、降低矿井漏风率和扩刷巷道断面等措施对矿井通风系统进行优化改造,降低矿井风阻;另一方面更换现有风机,提升通风动力.通过对通风系统优化改造,降低矿井风阻后,运用计算机对各时期进行解算分析,最终确定矿井主要通风机的型号.
針對八一煤礦轉入深部開採存在的通風阻力大,供風量不足和採掘工作麵溫度高等問題,開展瞭礦井通風技術測定.結果錶明礦井實際供風量為62 m3/s,低于需風量100 m3/s,供風嚴重不足,且通風總阻力為2712 Pa已接近礦井通風阻力上限.通風繫統中進風段、用風段和迴風段阻力比例為2∶1∶11.8,阻力分佈不閤理.根據礦井通風容易和睏難時期的生產部署和配風情況,提齣2方麵的技術措施:一方麵通過啟用併聯風巷、降低礦井漏風率和擴刷巷道斷麵等措施對礦井通風繫統進行優化改造,降低礦井風阻;另一方麵更換現有風機,提升通風動力.通過對通風繫統優化改造,降低礦井風阻後,運用計算機對各時期進行解算分析,最終確定礦井主要通風機的型號.
침대팔일매광전입심부개채존재적통풍조력대,공풍량불족화채굴공작면온도고등문제,개전료광정통풍기술측정.결과표명광정실제공풍량위62 m3/s,저우수풍량100 m3/s,공풍엄중불족,차통풍총조력위2712 Pa이접근광정통풍조력상한.통풍계통중진풍단、용풍단화회풍단조력비례위2∶1∶11.8,조력분포불합리.근거광정통풍용역화곤난시기적생산부서화배풍정황,제출2방면적기술조시:일방면통과계용병련풍항、강저광정루풍솔화확쇄항도단면등조시대광정통풍계통진행우화개조,강저광정풍조;령일방면경환현유풍궤,제승통풍동력.통과대통풍계통우화개조,강저광정풍조후,운용계산궤대각시기진행해산분석,최종학정광정주요통풍궤적형호.
Aiming at the big ventilation resistance that exists in the Bayi Coal Mine in the process of deep mining,insufficient amount of wind supply and high tunneling face temperature,this paper conducts the determination of mine ventilation technology.Results show that the mine actual quantity is 62 m3/s,lower than the cost of 100 m3/s,for a serious shortage of the wind.In addition,the total ventilation resistance is 2 712 Pa, which is close to mine ventilation resistance limit.In ventilation system into the wind,and with the wind and return air resistance ratio at 2∶1∶1 1 .8,the resistance distribution is not reasonable.According to the production deployment and the air distribution situation during the easy and the difficult period of the mine ventilation,this paper puts forward the technical measures in two aspects.On the one hand,it optimizes the mine ventilation system by enabling parallel airway,reducing air leakage rate of mine and expanding brush roadway section, etc.,so as to reduce the mine wind resistance;on the other hand,it replaces the existing fan and improves the ventilation.After optimizing the ventilation system,and reducing the mine wind resistance,it uses the computer to calculate and analyze the different periods of the main mine ventilator models,which are finally determined.