矿业工程研究
礦業工程研究
광업공정연구
MINERAL ENGINEEERING RESEACH
2014年
2期
15-18
,共4页
瓦斯抽采%封孔%钻场%地质资料
瓦斯抽採%封孔%鑽場%地質資料
와사추채%봉공%찬장%지질자료
gas extraction%hole sealing%drilling field%geological data
针对平顶山煤矿底抽巷穿层钻孔封孔工艺复杂,抽采瓦斯浓度低等问题,提出了“两堵一注”封孔新工艺,并对该装置封孔原理和封孔工艺进行了较为详细介绍。指出了该方法能够在瓦斯抽采方面取得很好的效果,但在平煤十三矿底抽巷的D23钻场得不到预期的效果,为此展开了各方面的研究。通过测量D23钻场每组平均瓦斯浓度,得出每组钻孔平均瓦斯浓度低于30%,达不到瓦斯抽采的预期效果,为此结合现场实际地质资料和分析钻场周围水的原因,得出了钻场周围断层较为发育,沟通了底抽巷的空气进入钻孔中,同时水也对瓦斯抽采浓度造成一定程度的影响。为此提出了3点技术措施:合理布置抽采钻场位置;降低水的影响;封孔质量标准化。
針對平頂山煤礦底抽巷穿層鑽孔封孔工藝複雜,抽採瓦斯濃度低等問題,提齣瞭“兩堵一註”封孔新工藝,併對該裝置封孔原理和封孔工藝進行瞭較為詳細介紹。指齣瞭該方法能夠在瓦斯抽採方麵取得很好的效果,但在平煤十三礦底抽巷的D23鑽場得不到預期的效果,為此展開瞭各方麵的研究。通過測量D23鑽場每組平均瓦斯濃度,得齣每組鑽孔平均瓦斯濃度低于30%,達不到瓦斯抽採的預期效果,為此結閤現場實際地質資料和分析鑽場週圍水的原因,得齣瞭鑽場週圍斷層較為髮育,溝通瞭底抽巷的空氣進入鑽孔中,同時水也對瓦斯抽採濃度造成一定程度的影響。為此提齣瞭3點技術措施:閤理佈置抽採鑽場位置;降低水的影響;封孔質量標準化。
침대평정산매광저추항천층찬공봉공공예복잡,추채와사농도저등문제,제출료“량도일주”봉공신공예,병대해장치봉공원리화봉공공예진행료교위상세개소。지출료해방법능구재와사추채방면취득흔호적효과,단재평매십삼광저추항적D23찬장득불도예기적효과,위차전개료각방면적연구。통과측량D23찬장매조평균와사농도,득출매조찬공평균와사농도저우30%,체불도와사추채적예기효과,위차결합현장실제지질자료화분석찬장주위수적원인,득출료찬장주위단층교위발육,구통료저추항적공기진입찬공중,동시수야대와사추채농도조성일정정도적영향。위차제출료3점기술조시:합리포치추채찬장위치;강저수적영향;봉공질량표준화。
According to the problems of complicated hole sealing processes and low gas concentration in bottom pumping alley of Pingdingshan coal mine,this paper proposes a new sealing technology,i.e.“two stuck and a grouting”,and describes the principle of the device sealing and sealing process in detail.This paper also points out that in gas drainage this method can achieve good results,but the drilling field of D23 of coal bottom pumping alley at the thirteenth mine in Pingdingshan cannot get the desired effect,so the research of all aspects must be discussed.By measuring the average gas concentration of each group of D23 drilling field,it concludes that each group borehole gas average concentrations are less than 30%,not reaching the expected effect of gas extraction,so we consider the actual geological data and the water around this drill field.It also concludes that the fault around the drilling field is developing and communicating air of bottom alley into the drilling hole,water can also make effects on the concentration of the gas extraction.At last,this paper puts forward three technical measures to make them better,that is suitable extraction drilling position,reduce the influence of the water,and developing hole sealing quality.