大坝基础%帷幕灌浆%拔贡水电站改扩建工程
大壩基礎%帷幕灌漿%拔貢水電站改擴建工程
대패기출%유막관장%발공수전참개확건공정
dam foundation%curtain grouting%Extension Project of Bagong Hydropower Station
拔贡水电站改扩建工程地质条件复杂,大坝基础帷幕灌浆效果对大坝是否能储水发电有着重要的影响,文章对大坝基础帷幕灌浆施工、施工中遇到的技术难题及解决的办法、灌浆的效果分析进行了阐述。
拔貢水電站改擴建工程地質條件複雜,大壩基礎帷幕灌漿效果對大壩是否能儲水髮電有著重要的影響,文章對大壩基礎帷幕灌漿施工、施工中遇到的技術難題及解決的辦法、灌漿的效果分析進行瞭闡述。
발공수전참개확건공정지질조건복잡,대패기출유막관장효과대대패시부능저수발전유착중요적영향,문장대대패기출유막관장시공、시공중우도적기술난제급해결적판법、관장적효과분석진행료천술。
The extension project of Bagong hydropower station has complex geological conditions;therefore, the effect of dam foundation grouting curtain has great impact on the project's water storage and power generation capacities. The paper makes an introduction to the curtain grouting construction of dam foundation, the technical problems en-countered in the construction process and their solutions as well as the analysis on grouting effect.