水利与建筑工程学报
水利與建築工程學報
수리여건축공정학보
TECHNIQUE OF SEEPAGE CONTROL
2013年
6期
121-124,133
,共5页
导流洞%衬砌结构%优化分析%稳定性分析
導流洞%襯砌結構%優化分析%穩定性分析
도류동%츤체결구%우화분석%은정성분석
diversion tunnel%lining structure%optimization analysis%stability analysis
根据国内外对于地下洞室围岩稳定性及衬砌结构优化设计的研究思路,运用 ANSYS 数值分析软件对某直墙半圆拱导流洞工程进行分析,选取典型断面建立有限元分析模型。分析开挖期的围岩应力分布情况与变形规律,优化后运行期围岩及支护的稳定性态。得出如下结论:隧洞全段采用分层开挖、喷锚支护的开挖支护方案,对衬砌结构进行优化验算后,对于Ⅲ1类围岩采用70 cm 厚的 C25钢筋混凝土衬砌;Ⅲ2类围岩采用90 cm 厚的 C25钢筋混凝土衬砌;Ⅳ类围岩采用90 cm 厚的 C25钢筋混凝土衬砌。
根據國內外對于地下洞室圍巖穩定性及襯砌結構優化設計的研究思路,運用 ANSYS 數值分析軟件對某直牆半圓拱導流洞工程進行分析,選取典型斷麵建立有限元分析模型。分析開挖期的圍巖應力分佈情況與變形規律,優化後運行期圍巖及支護的穩定性態。得齣如下結論:隧洞全段採用分層開挖、噴錨支護的開挖支護方案,對襯砌結構進行優化驗算後,對于Ⅲ1類圍巖採用70 cm 厚的 C25鋼觔混凝土襯砌;Ⅲ2類圍巖採用90 cm 厚的 C25鋼觔混凝土襯砌;Ⅳ類圍巖採用90 cm 厚的 C25鋼觔混凝土襯砌。
근거국내외대우지하동실위암은정성급츤체결구우화설계적연구사로,운용 ANSYS 수치분석연건대모직장반원공도류동공정진행분석,선취전형단면건립유한원분석모형。분석개알기적위암응력분포정황여변형규률,우화후운행기위암급지호적은정성태。득출여하결론:수동전단채용분층개알、분묘지호적개알지호방안,대츤체결구진행우화험산후,대우Ⅲ1류위암채용70 cm 후적 C25강근혼응토츤체;Ⅲ2류위암채용90 cm 후적 C25강근혼응토츤체;Ⅳ류위암채용90 cm 후적 C25강근혼응토츤체。
According to the series researches of underground tunnel stability and lining structure optimization design ,and by using the ANSYS to carry out the analysis of a hydro-junction diversion tunnel with straight wall and semi-circular arch ,the finite element analysis model is established by selecting the typical tunnel section .Firstly ,the stress distribu-tion situation and deformation rule of the surrounding rock in the process of excavation are analyzed ,and the analysis is also made for the surrounding rock and timbering stabilization during the operation after optimization .Then ,after the analysis ,the conclusions are obtained as follows :the tunnel is excavated by the method of entire cross section and shotcrete-rockbolt timbering ,after the optimized checking about the lining structure ,the Ⅲ 1 kind of surrounding rock is treated by using the C25 reinforced concrete lining with the thickness of 70 cm ,the Ⅲ 2 kind of surrounding rock is treat-ed by using the C25 reinforced concrete lining with the thickness of 90 cm ,and the Ⅳ kind of surrounding rock is also treated by using the C25 reinforced concrete lining with the thickness of 90 cm .