港珠澳大桥%预制墩台%吊点%设计
港珠澳大橋%預製墩檯%弔點%設計
항주오대교%예제돈태%조점%설계
Hong Kong-Zhuhai-Macao Bridge%prefabricated abutment%lifting point%design
针对港珠澳大桥整体式墩台的吊装工艺进行探讨,研究满足港珠澳大桥预制构件吊运安装的吊点设计和预埋件设置,提出了港珠澳大桥超大型预制墩台构件吊运安装的解决方法,达到安全吊装的目的。
針對港珠澳大橋整體式墩檯的弔裝工藝進行探討,研究滿足港珠澳大橋預製構件弔運安裝的弔點設計和預埋件設置,提齣瞭港珠澳大橋超大型預製墩檯構件弔運安裝的解決方法,達到安全弔裝的目的。
침대항주오대교정체식돈태적조장공예진행탐토,연구만족항주오대교예제구건조운안장적조점설계화예매건설치,제출료항주오대교초대형예제돈태구건조운안장적해결방법,체도안전조장적목적。
The paper discussed the technology for handling and installation of integral piers and abutments for Hong Kong-Zhuhai-Macao Bridge , studied the design of reasonable lifting points and the layout of embedded parts for handling and in-stallation of precast members for Hong Kong-Zhuhai-Macao Bridge, and forwarded solutions to handling and installation of large precast pier components for Hong Kong-Zhuhai-Macao Bridge so as to ensure safety during handling and installation of such large components.