绿色科技
綠色科技
록색과기
LVSE DASHIJIU
2014年
1期
9-11
,共3页
陈玮%史玉柱%刘刚%虞婧
陳瑋%史玉柱%劉剛%虞婧
진위%사옥주%류강%우청
水土流失%风电场%预测方法%治理措施
水土流失%風電場%預測方法%治理措施
수토류실%풍전장%예측방법%치리조시
soil and water loss%wind farm%prediction method%control measure
介绍了湖北省49.5M W风电场工程概况,对水土流失原因进行了分析,得出水土流失主要发生在施工准备期和施工期,并采用工程类比法预测了水土流失量,针对该工程特点给出了水土流失治理措施,为类似风电工程提供参考。
介紹瞭湖北省49.5M W風電場工程概況,對水土流失原因進行瞭分析,得齣水土流失主要髮生在施工準備期和施工期,併採用工程類比法預測瞭水土流失量,針對該工程特點給齣瞭水土流失治理措施,為類似風電工程提供參攷。
개소료호북성49.5M W풍전장공정개황,대수토류실원인진행료분석,득출수토류실주요발생재시공준비기화시공기,병채용공정류비법예측료수토류실량,침대해공정특점급출료수토류실치리조시,위유사풍전공정제공삼고。
This article introduces the project of 49 .5MW wind farm in Hubei Province ,analyzesthe reasonsof-water and soil loss ,and the conclusion is that soil and water loss occurs mainly in the preparation and con-struction period of theconstruction .And then it usesthe engineering analogy method to predict water and soil loss and puts forwardthe control measures according to the engineering characteristics ,so as to providerefer-ences for similar wind power projects .