东南大学学报(自然科学版)
東南大學學報(自然科學版)
동남대학학보(자연과학판)
JOURNAL OF SOUTHEAST UNIVERSITY
2014年
1期
155-161
,共7页
桥墩结构%局部冲刷%冲刷深度%冲刷坑形态%冲刷影响区域
橋墩結構%跼部遲刷%遲刷深度%遲刷坑形態%遲刷影響區域
교돈결구%국부충쇄%충쇄심도%충쇄갱형태%충쇄영향구역
pier structures (shapes)%local scour%scour depth%scour development pattern%scour influence area
选用基于动网格自更新技术的三维CFD冲刷模型,可以解决既有一维、二维计算研究方法的局限性以及准确性问题,对桥墩冲刷以及周边流场三维性态进行全过程动态跟踪分析.首先采用经典B .W.Melville实验环境以及实验数据,分别从流场、流速以及冲刷坑进行冲刷模型的准确性验证.进而利用该数值模型分别对3种典型桥墩(单柱墩、双柱墩、排墩)周边河床的冲刷深度、冲刷坑形态以及冲刷影响区域进行数值分析,通过数据分析得出各自完全不同的冲刷发展趋势与性态特征.通过对比分析可以看出,桥墩结构形式对桥墩局部冲刷三维性态发展有着显著影响,区分桥墩结构形式对桥墩冲刷设计、理论分析以及长期监测方案设置具有相当的必要性与重要性.
選用基于動網格自更新技術的三維CFD遲刷模型,可以解決既有一維、二維計算研究方法的跼限性以及準確性問題,對橋墩遲刷以及週邊流場三維性態進行全過程動態跟蹤分析.首先採用經典B .W.Melville實驗環境以及實驗數據,分彆從流場、流速以及遲刷坑進行遲刷模型的準確性驗證.進而利用該數值模型分彆對3種典型橋墩(單柱墩、雙柱墩、排墩)週邊河床的遲刷深度、遲刷坑形態以及遲刷影響區域進行數值分析,通過數據分析得齣各自完全不同的遲刷髮展趨勢與性態特徵.通過對比分析可以看齣,橋墩結構形式對橋墩跼部遲刷三維性態髮展有著顯著影響,區分橋墩結構形式對橋墩遲刷設計、理論分析以及長期鑑測方案設置具有相噹的必要性與重要性.
선용기우동망격자경신기술적삼유CFD충쇄모형,가이해결기유일유、이유계산연구방법적국한성이급준학성문제,대교돈충쇄이급주변류장삼유성태진행전과정동태근종분석.수선채용경전B .W.Melville실험배경이급실험수거,분별종류장、류속이급충쇄갱진행충쇄모형적준학성험증.진이이용해수치모형분별대3충전형교돈(단주돈、쌍주돈、배돈)주변하상적충쇄심도、충쇄갱형태이급충쇄영향구역진행수치분석,통과수거분석득출각자완전불동적충쇄발전추세여성태특정.통과대비분석가이간출,교돈결구형식대교돈국부충쇄삼유성태발전유착현저영향,구분교돈결구형식대교돈충쇄설계、이론분석이급장기감측방안설치구유상당적필요성여중요성.
In the present study,a three-dimensional (3 D)computational fluid dynamics (CFD)nu-merical model is applied to simulate the local bridge scour based on the dynamic mesh techniques, which solves the limitation and accuracy issues of the existing 1 D and 2 D methodologies.Using this model,the local scour 3 D Development process including the surrounding flow field can be traced in real time.The simulation accuracy is proved by comparing the numerical results to the measuring da-ta in the classic B.W.Melville experiment from the viewpoints of flow field,velocity,and scour hole.After that the scour depth,scour development pattern,and scour influence area are numerical-ly investigated under three different typical pier structures (shapes).By conducting data analysis this simulation gives that different pier structures (shapes)result in totally different local scour results in-cluding developing trend and characteristics.It can be concluded that the effects of pier structures (shapes)on local scour 3 D development is very obvious,which should be necessary and important in the scour design,analysis and long-term monitoring.