现代城市轨道交通
現代城市軌道交通
현대성시궤도교통
MODERN URBAN TRANSIT
2014年
1期
79-81
,共3页
地铁工程%基坑降水%辅助措施%盲沟
地鐵工程%基坑降水%輔助措施%盲溝
지철공정%기갱강수%보조조시%맹구
metro project%pit dewatering%auxiliay measures%blind drain
基坑降水是保证深基坑施工的一项重要措施,降水的效果决定工程的顺利与否,而复杂的地质环境影响着降水的效果,在基坑底部增加盲沟措施对增强降水效果能起到明显的作用,为深基坑下无水作业创造了条件。
基坑降水是保證深基坑施工的一項重要措施,降水的效果決定工程的順利與否,而複雜的地質環境影響著降水的效果,在基坑底部增加盲溝措施對增彊降水效果能起到明顯的作用,為深基坑下無水作業創造瞭條件。
기갱강수시보증심기갱시공적일항중요조시,강수적효과결정공정적순리여부,이복잡적지질배경영향착강수적효과,재기갱저부증가맹구조시대증강강수효과능기도명현적작용,위심기갱하무수작업창조료조건。
Pit dewatering is an important measure to ensure deep foundation construction, the success of a project depends on the effect of water drawdown, while the complex geological environment influences the effect of dewatering. Having more blind ditches at the bottom of the pit as a measure is playing a significant role in the enhancing effect of dewatering, while it provides conditions for working in deep foundation pit without water.