库容曲线%冲淤%西津水电站
庫容麯線%遲淤%西津水電站
고용곡선%충어%서진수전참
storage-capacity curve%deposition and erosion%Xijin hydropower station
西津水电站自建库以来,由于河道的采砂、沿河工程建设、洪水等作用,库区河床地形及库容曲线均发生了变化,通过对库区固定断面地形的复测分析河床的演变并修正库容曲线。
西津水電站自建庫以來,由于河道的採砂、沿河工程建設、洪水等作用,庫區河床地形及庫容麯線均髮生瞭變化,通過對庫區固定斷麵地形的複測分析河床的縯變併脩正庫容麯線。
서진수전참자건고이래,유우하도적채사、연하공정건설、홍수등작용,고구하상지형급고용곡선균발생료변화,통과대고구고정단면지형적복측분석하상적연변병수정고용곡선。
Since the reservoir of Xijin hydropower station has been put into operation, the riverbed topography and the storage-capacity curve were changed due to river sand mining, the project construction along the river, and the effects of floods etc. The riverbed evolution was analyzed and the storage-capacity curve was corrected through resurveying the fixed section topography of reservoir area.