水布垭电厂3、4号机组推力轴承运行情况分析
수포오전엄3、4호궤조추력축승운행정황분석
Performance Analysis of Thrust Bearings of the No.3 and No.4 Generator Units in Shuibuya Power Station
저자의 최근 논문