电网技术
電網技術
전망기술
POWER SYSTEM TECHNOLOGY
2014年
3期
694-699
,共6页
邹建林%安军%穆钢%邵广惠%徐兴伟%候凯元%岳涵
鄒建林%安軍%穆鋼%邵廣惠%徐興偉%候凱元%嶽涵
추건림%안군%목강%소엄혜%서흥위%후개원%악함
电力系统%轨迹%暂态稳定%轨迹灵敏度
電力繫統%軌跡%暫態穩定%軌跡靈敏度
전력계통%궤적%잠태은정%궤적령민도
power system%trajectory%transient stability%trajectory sensitivity
轨迹灵敏度是定量描述参数对动态系统行为影响的数学工具,蕴含了丰富的系统动态信息。分析了功角相对于故障切除时间的灵敏度与电力系统暂态稳定程度之间的关系,在惯性中心(COI)坐标系下,建立了定量评估发电机暂态稳定程度和全系统暂态稳定程度的指标体系。通过对单机无穷大(SMIB)系统和New England10机39节点系统的算例分析,结果验证了所提指标的单调性和有效性。将基于轨迹灵敏度的稳定评价指标与轨迹分析方法所提出的稳定指标相比较,结果表明评估电力系统暂态稳定性的指标仅需一次仿真计算即可准确评估发电机和全系统的暂态稳定性,无需建立能量函数、计算更为简捷,具有较好的应用价值。
軌跡靈敏度是定量描述參數對動態繫統行為影響的數學工具,蘊含瞭豐富的繫統動態信息。分析瞭功角相對于故障切除時間的靈敏度與電力繫統暫態穩定程度之間的關繫,在慣性中心(COI)坐標繫下,建立瞭定量評估髮電機暫態穩定程度和全繫統暫態穩定程度的指標體繫。通過對單機無窮大(SMIB)繫統和New England10機39節點繫統的算例分析,結果驗證瞭所提指標的單調性和有效性。將基于軌跡靈敏度的穩定評價指標與軌跡分析方法所提齣的穩定指標相比較,結果錶明評估電力繫統暫態穩定性的指標僅需一次倣真計算即可準確評估髮電機和全繫統的暫態穩定性,無需建立能量函數、計算更為簡捷,具有較好的應用價值。
궤적령민도시정량묘술삼수대동태계통행위영향적수학공구,온함료봉부적계통동태신식。분석료공각상대우고장절제시간적령민도여전력계통잠태은정정도지간적관계,재관성중심(COI)좌표계하,건립료정량평고발전궤잠태은정정도화전계통잠태은정정도적지표체계。통과대단궤무궁대(SMIB)계통화New England10궤39절점계통적산례분석,결과험증료소제지표적단조성화유효성。장기우궤적령민도적은정평개지표여궤적분석방법소제출적은정지표상비교,결과표명평고전력계통잠태은정성적지표부수일차방진계산즉가준학평고발전궤화전계통적잠태은정성,무수건립능량함수、계산경위간첩,구유교호적응용개치。
Trajectory sensitivity is a mathematical tool to quantitatively describe the influence on the dynamic behavior of the power system, it contains a wealth dynamic information of power system. In this paper, it is studied the relations between sensitivity of power angle to fault clearing time and transient stability of power system, established the index system that quantitative assessment the transient stability of generator and whole system in the center of inertia (COI). Case studies are carried out on the one-machine-infinite-bus(SMIB) system and 10-generator 39-bus New England test power system, some results are reported to verify the monotonicity and effectiveness of the index. In comparison to the index of trajectory analysis method, the index provided in this paper accurate evaluation of the transient stability of generator and whole system, also the transient stability should be calculated for only once, it don't need to establish the energy function, the calculation more simple and has a better applied cost.