苏里格气田气井普遍采用井下节流工艺,随着气田的开发,气井压力和产量逐渐下降,井下节流器无法排液,井筒产生积液现象,造成井底回压大,影响气井生产。为延长气井变为低产、低效井的时间,有必要对节流器的合理打捞时机进行研究。针对井下节流条件下的井筒积液及排除问题,采用软件模拟和生产、测试数据分析等方法,通过对井下节流井井筒积液流态分析、过程研究及不同积液程度下的主控机理分析,明确了造成节流气井压力、产量迅速下降现象的起点为节流器上段开始积液时,并以此为基础确定了苏里格气田积液井节流器的合理打捞时机,为生产现场节流器打捞时机提供了理论及实践经验。
囌裏格氣田氣井普遍採用井下節流工藝,隨著氣田的開髮,氣井壓力和產量逐漸下降,井下節流器無法排液,井筒產生積液現象,造成井底迴壓大,影響氣井生產。為延長氣井變為低產、低效井的時間,有必要對節流器的閤理打撈時機進行研究。針對井下節流條件下的井筒積液及排除問題,採用軟件模擬和生產、測試數據分析等方法,通過對井下節流井井筒積液流態分析、過程研究及不同積液程度下的主控機理分析,明確瞭造成節流氣井壓力、產量迅速下降現象的起點為節流器上段開始積液時,併以此為基礎確定瞭囌裏格氣田積液井節流器的閤理打撈時機,為生產現場節流器打撈時機提供瞭理論及實踐經驗。
소리격기전기정보편채용정하절류공예,수착기전적개발,기정압력화산량축점하강,정하절류기무법배액,정통산생적액현상,조성정저회압대,영향기정생산。위연장기정변위저산、저효정적시간,유필요대절류기적합리타로시궤진행연구。침대정하절류조건하적정통적액급배제문제,채용연건모의화생산、측시수거분석등방법,통과대정하절류정정통적액류태분석、과정연구급불동적액정도하적주공궤리분석,명학료조성절류기정압력、산량신속하강현상적기점위절류기상단개시적액시,병이차위기출학정료소리격기전적액정절류기적합리타로시궤,위생산현장절류기타로시궤제공료이론급실천경험。
The downhole throttle technique is wildly used in development of Sulige Gas Field. With gas ifeld development, gradual decrease of gas well pressure and output, downhole throttle cannot drain the liquid, causing liquid loading of well bore and large bottom back pressure, thus affecting the production of gas well. To prolong the period before the gas well becomes low productivity and low efifciency, it is necessary to study the reasonable ifshing time of throttle. For the liquid loading of well bore in downhole throttling condi-tion and problem solution, the methods such as software simulation and analysis of production and testing data, are adopted. The lfow pattern analysis of liquid loading of well bore under downhole throttling well, process study and analysis of main control mechanism under different liquid loading show that the starting point of rapid decrease of throttling gas well pressure and output is when the liquid loading of throttle starts and deifnes the reasonable ifshing time of throttle of liquid loading well of Sulige Gas Field based on this to provide theories and practical experience for throttle ifshing time on production site.