由于勘察阶段勘探和试验工作受限或不够完善,影响到隧道涌水量预测的各主要因素难以准确确定,从而导致隧道设计预测涌水量不准确,施工中突、涌水灾害时有发生,进而严重地影响了隧道施工进度及安全。以部分已施工隧道为例,对施工阶段出现的问题与勘察阶段勘探和试验中各项工作完成的质量进行详细对照分析,找出目前长大隧道水文地质勘察中存在的主要问题,有助于今后有效进行隧道水文地质勘察,提高隧道涌水量预测的准确性,避免出现施工阶段的补充勘察及二次设计。
由于勘察階段勘探和試驗工作受限或不夠完善,影響到隧道湧水量預測的各主要因素難以準確確定,從而導緻隧道設計預測湧水量不準確,施工中突、湧水災害時有髮生,進而嚴重地影響瞭隧道施工進度及安全。以部分已施工隧道為例,對施工階段齣現的問題與勘察階段勘探和試驗中各項工作完成的質量進行詳細對照分析,找齣目前長大隧道水文地質勘察中存在的主要問題,有助于今後有效進行隧道水文地質勘察,提高隧道湧水量預測的準確性,避免齣現施工階段的補充勘察及二次設計。
유우감찰계단감탐화시험공작수한혹불구완선,영향도수도용수량예측적각주요인소난이준학학정,종이도치수도설계예측용수량불준학,시공중돌、용수재해시유발생,진이엄중지영향료수도시공진도급안전。이부분이시공수도위례,대시공계단출현적문제여감찰계단감탐화시험중각항공작완성적질량진행상세대조분석,조출목전장대수도수문지질감찰중존재적주요문제,유조우금후유효진행수도수문지질감찰,제고수도용수량예측적준학성,피면출현시공계단적보충감찰급이차설계。
If the exploration and experimental works in investigation stage are limited or not perfect, it will be difficult to accurately determine the main factors which affect the tunnel water inflow prediction;and consequentially this will make the water inflow prediction in tunnel design stage inaccurate, resulting in water inrush or water inflow hazards occurring in tunnel construction stage from time to time, and posing a serious threat to the tunnel construction progress and safety. To solve this problem, in this paper, some of the under-construction tunnels were taken as the examples, and then a detailed comparative analysis was carried out, between the problems existing in construction stage and the relevant exploration/ experiment work qualities completed in investigation stage. As a result, the main problems existing in hydrogeology investigation stages for long and large tunnels have been found out in this study. This study can be useful for making an effective hydrogeology investigation in future, improving the accuracy of tunnel water inflow prediction, and therefore avoiding supplementary investigation and design alteration in construction stage.