铁道标准设计
鐵道標準設計
철도표준설계
RAILWAY STANDARD DESIGN
2014年
4期
52-54
,共3页
桥梁基础%灌注桩%注浆%桩基承载力
橋樑基礎%灌註樁%註漿%樁基承載力
교량기출%관주장%주장%장기승재력
bridge foundation%cast-in-situ pile%grouting%bearing capacity of pile foundation
结合工程实例介绍灌注桩后注浆施工工艺,分析城市立交工程中的灌注桩后注浆技术,并通过试验结果分析得出复合后注浆技术对桩侧摩阻力和桩端阻力的提高系数,表明复合后注浆技术可大幅提高桩基承载力,节约工程投资。
結閤工程實例介紹灌註樁後註漿施工工藝,分析城市立交工程中的灌註樁後註漿技術,併通過試驗結果分析得齣複閤後註漿技術對樁側摩阻力和樁耑阻力的提高繫數,錶明複閤後註漿技術可大幅提高樁基承載力,節約工程投資。
결합공정실례개소관주장후주장시공공예,분석성시입교공정중적관주장후주장기술,병통과시험결과분석득출복합후주장기술대장측마조력화장단조력적제고계수,표명복합후주장기술가대폭제고장기승재력,절약공정투자。
In combination with actual project cases, the paper introduced the post-grouting technology of cast-in-situ piles, and analyzed the application of post-grouting technology of cast-in-situ piles in city overpass bridges. Meanwhile, through analysis on experiment results, the increasing coefficients of both the pile side friction and the pile tip resistance, which arose from the composite post-grouting technology, were obtained in this paper. And this proves that the composite post-grouting technology can be conducive to increasing the pile foundation bearing capacity and decreasing the project investment considerably.