互通跨线桥%连续箱梁%施工分析
互通跨線橋%連續箱樑%施工分析
호통과선교%련속상량%시공분석
interflow overpass bridge%continuous box girder%construction analysis
本文通过石佛互通跨线桥工程,对互通跨线桥连续箱梁现浇施工进行了分析,分别介绍了地基处理、碗扣式支架搭设、支架预压、支座安装、模板工程、钢筋工程、混凝土工程、预应力施工、封锚压浆,为互通跨线桥连续箱梁现浇施工提供一定参考意义。
本文通過石彿互通跨線橋工程,對互通跨線橋連續箱樑現澆施工進行瞭分析,分彆介紹瞭地基處理、碗釦式支架搭設、支架預壓、支座安裝、模闆工程、鋼觔工程、混凝土工程、預應力施工、封錨壓漿,為互通跨線橋連續箱樑現澆施工提供一定參攷意義。
본문통과석불호통과선교공정,대호통과선교련속상량현요시공진행료분석,분별개소료지기처리、완구식지가탑설、지가예압、지좌안장、모판공정、강근공정、혼응토공정、예응력시공、봉묘압장,위호통과선교련속상량현요시공제공일정삼고의의。
Based on Shifo interflow overpass bridge project, this article analyzes the interflow overpass bridge continuous box girder cast-in-place construction and separately introduces the foundation treatment, bowl type support build-up, bracket prepressing, bearing installation, template engineering, reinforcing bar engineering, concrete engineering, prestressed construction and sealing anchor grouting. It is of certain referential significance for interflow overpass bridge continuous box girder cast-in-place construction.