王克忠%尹宏磊%李仲奎%满志伟
王剋忠%尹宏磊%李仲奎%滿誌偉
왕극충%윤굉뢰%리중규%만지위
水利工程%尾水调压室%断层%穹顶围岩%力学与变形特征
水利工程%尾水調壓室%斷層%穹頂圍巖%力學與變形特徵
수리공정%미수조압실%단층%궁정위암%역학여변형특정
hydraulic engineering%tailrace surge tank%fault%dome surrounding rock mass%mechanical and deformation characteristics
锦屏一级水电站尾水调压室为2个巨型圆筒状竖井,且位于2条大断层及多组节理切割的复杂高应力地质体内,球冠状顶部开挖支护困难。工程应用和理论研究均表明:开挖方式和支护参数是影响尾水调压室穹顶应力分布和变形的关键因素。基于对1#尾水调压室顶拱f14断层及煌斑岩脉,断层影响带的现场勘察研究采用力学分析、原位监测和三维数值模拟等手段,对尾水调压室围岩变形破坏机制进行深入分析,研究尾水调压室开挖过程中穹顶围岩变形和力学特征。最后,对尾水调压室的开挖、支护提出若干有益的建议,为锦屏一级水电站的动态开挖支护设计提供技术支持。
錦屏一級水電站尾水調壓室為2箇巨型圓筒狀豎井,且位于2條大斷層及多組節理切割的複雜高應力地質體內,毬冠狀頂部開挖支護睏難。工程應用和理論研究均錶明:開挖方式和支護參數是影響尾水調壓室穹頂應力分佈和變形的關鍵因素。基于對1#尾水調壓室頂拱f14斷層及煌斑巖脈,斷層影響帶的現場勘察研究採用力學分析、原位鑑測和三維數值模擬等手段,對尾水調壓室圍巖變形破壞機製進行深入分析,研究尾水調壓室開挖過程中穹頂圍巖變形和力學特徵。最後,對尾水調壓室的開挖、支護提齣若榦有益的建議,為錦屏一級水電站的動態開挖支護設計提供技術支持。
금병일급수전참미수조압실위2개거형원통상수정,차위우2조대단층급다조절리절할적복잡고응력지질체내,구관상정부개알지호곤난。공정응용화이론연구균표명:개알방식화지호삼수시영향미수조압실궁정응력분포화변형적관건인소。기우대1#미수조압실정공f14단층급황반암맥,단층영향대적현장감찰연구채용역학분석、원위감측화삼유수치모의등수단,대미수조압실위암변형파배궤제진행심입분석,연구미수조압실개알과정중궁정위암변형화역학특정。최후,대미수조압실적개알、지호제출약간유익적건의,위금병일급수전참적동태개알지호설계제공기술지지。
The surge tank at tailrace of Jinping I hydropower station is composed of two vertical cylindrical wells of large-diameter at the location of high stress and complex geological configurations with two large scale faults and multiple sets of joints. It was difficult to cavern out the domes and setup supporting structures at the top of cylindrical wells. Engineering practice and theoretical research show that the methods of excavation and the parameters of supporting are the key factors influencing the stress distribution and deformation at the crest of the dome of the tailrace surge tank. Lamprophyre veins and fault f14 were found to exist above the dome of tailrace surge tank #1 through in-situ investigations. The deformation and failure mechanisms of surrounding rock of the tailrace surge tank are studied through mechanical analysis,in-situ monitoring and 3D numerical simulation. The deformational and mechanical characteristics of the dome rocks during excavation process were studied. Some advices on the excavation and support for the tailrace surge tank are thus presented as the technical supports for its excavation and design of the support.