玉树与青海主网330 kV联网工程输电距离长,受端110 kV 玉树电网网架结构薄弱,工程调试期间存在系统电压越限和频率稳定问题。为此,提出投切330 kV空载线路操作和SVC设备调试试验操作的电压预控方案,解决了工程调试期间玛多-玉树空载线路投切以及玉树站35 kV SVC 设备带电投切时的系统电压越限问题,并用实测数据验证了上述电压预控方案的有效性。仿真分析并列试验操作对开关两侧母线电压和玉树机组无功出力的影响,提出了玉树与青海主网并列试验的预控策略。分析玉树电网水电机组调速系统参数、负荷模型以及解列点潮流对解列后玉树电网频率变化的影响,提出了玉树与青海主网解列试验的预控策略。上述电压预控方案和并、解列预控策略已应用于实际联网工程调试试验中。
玉樹與青海主網330 kV聯網工程輸電距離長,受耑110 kV 玉樹電網網架結構薄弱,工程調試期間存在繫統電壓越限和頻率穩定問題。為此,提齣投切330 kV空載線路操作和SVC設備調試試驗操作的電壓預控方案,解決瞭工程調試期間瑪多-玉樹空載線路投切以及玉樹站35 kV SVC 設備帶電投切時的繫統電壓越限問題,併用實測數據驗證瞭上述電壓預控方案的有效性。倣真分析併列試驗操作對開關兩側母線電壓和玉樹機組無功齣力的影響,提齣瞭玉樹與青海主網併列試驗的預控策略。分析玉樹電網水電機組調速繫統參數、負荷模型以及解列點潮流對解列後玉樹電網頻率變化的影響,提齣瞭玉樹與青海主網解列試驗的預控策略。上述電壓預控方案和併、解列預控策略已應用于實際聯網工程調試試驗中。
옥수여청해주망330 kV련망공정수전거리장,수단110 kV 옥수전망망가결구박약,공정조시기간존재계통전압월한화빈솔은정문제。위차,제출투절330 kV공재선로조작화SVC설비조시시험조작적전압예공방안,해결료공정조시기간마다-옥수공재선로투절이급옥수참35 kV SVC 설비대전투절시적계통전압월한문제,병용실측수거험증료상술전압예공방안적유효성。방진분석병렬시험조작대개관량측모선전압화옥수궤조무공출력적영향,제출료옥수여청해주망병렬시험적예공책략。분석옥수전망수전궤조조속계통삼수、부하모형이급해렬점조류대해렬후옥수전망빈솔변화적영향,제출료옥수여청해주망해렬시험적예공책략。상술전압예공방안화병、해렬예공책략이응용우실제련망공정조시시험중。
There are difficulties in the interconnection project of 330 kV Qinghai power grid with 110 kV Yushu power system such as long transmission distance, weak structure at receiving end in 110 kV Yushu power system, system voltage out-of-limit and frequency instability during the commissioning. For this reason, a voltage pre-control scheme for energizing operation of no-load 330 kV transmission line and the commissioning test of 35 kV SVC in Yushu power system is proposed to solve the out-of-limit of system voltage caused by energizing operation of no-load transmission line from Maduo to Yushu and hot-line switching of 35 kV SVC in Yushu substation during the commissioning, and the effectiveness of the proposed voltage pre-control scheme is validated by measured data during the commissioning. The impacts of connection test on bus voltages at both sides of the circuit breaker and reactive output of Yushu hydropower generating units are simulated and the pre-control strategy for connection test of 330 kV Qinghai power grid with Yushu power system is put forward. The impacts of speed regulation system parameter of hydropower generating units in Yushu power system, load model of the Yushu power system and the power flow at the disconnection-point on frequency variation in post-disconnection Yushu power system are analyzed, and the pre-control strategy for the disconnection test between Qinghai power grid and Yushu power system is given. Above-mentioned voltage pre-control scheme and the pre-control strategy for system connection as well as the pre-control strategy for system disconnection have been applied in the commissioning test of actual power grid interconnection.