立井井壁单位外表面积竖向附加力的数值较难准确确定,相关规范中仅注明了可根据具体条件按试验数据或经验选取。本文基于16个已破裂立井案例,通过破裂断面上的强度关系反演推算得到附加力的有效均值。计算结果表明:同一煤矿中不同立井的附加力值较为接近,不同煤矿的附加力值相差较大。预制混凝土结构与土体的接触不够紧密,故预制井壁的竖向附加力值较小。附加力的大小并不取决于立井的深度,而与地质条件有关。影响竖向附加力大小的因素众多,仅依照地质资料要准确确定某一矿井的竖向附加力取值是非常困难的。分析表明:若新建矿井的地质条件与本文反演计算中的矿井类似或相近,其竖向附加力可选相近矿井的相应值做参考。
立井井壁單位外錶麵積豎嚮附加力的數值較難準確確定,相關規範中僅註明瞭可根據具體條件按試驗數據或經驗選取。本文基于16箇已破裂立井案例,通過破裂斷麵上的彊度關繫反縯推算得到附加力的有效均值。計算結果錶明:同一煤礦中不同立井的附加力值較為接近,不同煤礦的附加力值相差較大。預製混凝土結構與土體的接觸不夠緊密,故預製井壁的豎嚮附加力值較小。附加力的大小併不取決于立井的深度,而與地質條件有關。影響豎嚮附加力大小的因素衆多,僅依照地質資料要準確確定某一礦井的豎嚮附加力取值是非常睏難的。分析錶明:若新建礦井的地質條件與本文反縯計算中的礦井類似或相近,其豎嚮附加力可選相近礦井的相應值做參攷。
립정정벽단위외표면적수향부가력적수치교난준학학정,상관규범중부주명료가근거구체조건안시험수거혹경험선취。본문기우16개이파렬립정안례,통과파렬단면상적강도관계반연추산득도부가력적유효균치。계산결과표명:동일매광중불동립정적부가력치교위접근,불동매광적부가력치상차교대。예제혼응토결구여토체적접촉불구긴밀,고예제정벽적수향부가력치교소。부가력적대소병불취결우립정적심도,이여지질조건유관。영향수향부가력대소적인소음다,부의조지질자료요준학학정모일광정적수향부가력취치시비상곤난적。분석표명:약신건광정적지질조건여본문반연계산중적광정유사혹상근,기수향부가력가선상근광정적상응치주삼고。
It is very difficult to confirm the value of vertical additive pressure of unit surface area of shaft wall ,which could be got by test or experience suggested by correlative code .Based on 16 ruptured shaft walls ,the value of vertical additive pressure has been inversion statistical analyzed in this article .It is found that the value of vertical additive pressure of different shaft walls in a same coal mine are quite closed , while which has distinguishable difference at different coal mine .Due to loose contact between soil and precast concrete shaft wall , the value of vertical additive pressure of precast concrete shaft wall is very small .The value of vertical additive pressure is not depended on the depth of shaft wall ,which depend on the engineering geology of shaft wall .While the value of vertical additive pressure is influenced by many factors ,which could hardly be accurately evaluated only by engineering geology .It is indicated that if the conditions of shaft wall to be constructed is similar to the cases analyzed in this article ,which value of vertical additive pressure could be quoted and referenced corresponding .