简要分析我国盾构、掘进机隧道修建技术的现状,包括水下盾构隧道、地铁盾构、TBM隧道和山岭TBM隧道的技术现状。通过列举典型工程案例,分析总结我国盾构、掘进机隧道技术存在的问题:1)水底公路隧道盾构直径过大,2)单层管片衬砌的耐久性不足,3)护盾式TBM有很多局限性,4)土压平衡盾构不是万能的,5)隧道线路标高选择不合理,6)工程建设中存在4大不合理。针对这些问题提出解决建议:1)一般情况下,水底公路隧道盾构直径不宜超过12 m;2)增设二次模筑混凝土衬砌,形成复合衬砌结构;3)取消护盾式TBM,提倡采用开敞式TBM;4)盾构选型时,应同时考虑比选泥水盾构、土压盾构和开敞式无刀盘盾构;5)避开在岩层交界面上选线;6)工程建设一定要坚持科学发展观。为盾构、掘进机隧道的设计和施工提出新思路,包括:1)无刀盘的开敞式网格盾构,2)压缩混凝土衬砌,3)TBM导洞超前再钻爆法扩挖,4)风井始发盾构。最后,指出大直径盾构不是发展方向,长距离掘进(>2 km)时,深埋盾构施工才是发展方向;并提出琼州海峡隧道采用盾构法施工(深埋优于浅埋),渤海湾海峡海底隧道采用直径为10 m的TBM+钻爆法施工,台湾海峡隧道采用深埋方案开敞式TBM+钻爆法施工的想法。
簡要分析我國盾構、掘進機隧道脩建技術的現狀,包括水下盾構隧道、地鐵盾構、TBM隧道和山嶺TBM隧道的技術現狀。通過列舉典型工程案例,分析總結我國盾構、掘進機隧道技術存在的問題:1)水底公路隧道盾構直徑過大,2)單層管片襯砌的耐久性不足,3)護盾式TBM有很多跼限性,4)土壓平衡盾構不是萬能的,5)隧道線路標高選擇不閤理,6)工程建設中存在4大不閤理。針對這些問題提齣解決建議:1)一般情況下,水底公路隧道盾構直徑不宜超過12 m;2)增設二次模築混凝土襯砌,形成複閤襯砌結構;3)取消護盾式TBM,提倡採用開敞式TBM;4)盾構選型時,應同時攷慮比選泥水盾構、土壓盾構和開敞式無刀盤盾構;5)避開在巖層交界麵上選線;6)工程建設一定要堅持科學髮展觀。為盾構、掘進機隧道的設計和施工提齣新思路,包括:1)無刀盤的開敞式網格盾構,2)壓縮混凝土襯砌,3)TBM導洞超前再鑽爆法擴挖,4)風井始髮盾構。最後,指齣大直徑盾構不是髮展方嚮,長距離掘進(>2 km)時,深埋盾構施工纔是髮展方嚮;併提齣瓊州海峽隧道採用盾構法施工(深埋優于淺埋),渤海灣海峽海底隧道採用直徑為10 m的TBM+鑽爆法施工,檯灣海峽隧道採用深埋方案開敞式TBM+鑽爆法施工的想法。
간요분석아국순구、굴진궤수도수건기술적현상,포괄수하순구수도、지철순구、TBM수도화산령TBM수도적기술현상。통과열거전형공정안례,분석총결아국순구、굴진궤수도기술존재적문제:1)수저공로수도순구직경과대,2)단층관편츤체적내구성불족,3)호순식TBM유흔다국한성,4)토압평형순구불시만능적,5)수도선로표고선택불합리,6)공정건설중존재4대불합리。침대저사문제제출해결건의:1)일반정황하,수저공로수도순구직경불의초과12 m;2)증설이차모축혼응토츤체,형성복합츤체결구;3)취소호순식TBM,제창채용개창식TBM;4)순구선형시,응동시고필비선니수순구、토압순구화개창식무도반순구;5)피개재암층교계면상선선;6)공정건설일정요견지과학발전관。위순구、굴진궤수도적설계화시공제출신사로,포괄:1)무도반적개창식망격순구,2)압축혼응토츤체,3)TBM도동초전재찬폭법확알,4)풍정시발순구。최후,지출대직경순구불시발전방향,장거리굴진(>2 km)시,심매순구시공재시발전방향;병제출경주해협수도채용순구법시공(심매우우천매),발해만해협해저수도채용직경위10 m적TBM+찬폭법시공,태만해협수도채용심매방안개창식TBM+찬폭법시공적상법。
The state-of-art of tunneling by TBM/shield in China,including under-water tunneling by shield,Metro tun-neling by shield and mountain-crossing tunneling by TBM,is analyzed briefly.The problems in the tunneling by TBM/shield in China are analyzed on basis of typical case histories:1 )The diameter of the shields for underwater highway tunnels is too large;2)The durability of the single segment lining shell is inadequate;3)Shield TBMhas many limita-tions;4)EPB shield is not applicable for all cases;5)The elevation of the route of some tunnels is irrational;6)Some projects suffer from irrational construction schedule,irrational construction cost,irrational construction contract and irra-tional construction scheme.Regarding the afore-mentioned problems,the following proposals are made:1 )In general cases,the diameter of the shields for under-water highway tunnels should not be more than 12 m;2)Cast-in-situ sec-ondary lining should be added to form composite lining structure;3)Shield TBMshould be cancelled,while open TBM should be promoted;4)Slurry shield,EPB shield and open shield should be considered in shield type selection;5 ) The tunneling route should not be placed along the interface between different strata;6)The concept of scientific devel-opment must be held in project construction.The following new solutions are proposed for tunneling by TBM/shield in China:1 )Open grid shields should be applied;2 )Extruded concrete lining should be applied;3 )The method of“TBM bore +enlarging by drill and blast”should be applied;4)Shield can be launched from ventilation shaft in con-gested area.Finally it is stated that:1 )Large diameter shield is not the development trend;In the case of long-distance boring (longer than 2 km),deep shield tunneling is the development trend;2 )Shield tunneling method should be a-dopted for Qiongzhou strait crossing tunnel (the deep shield tunneling proposal is better than the shallow shield tunneling proposal);3)The proposal of“10 mm TBM+drill and blast”method should be adopted for Bohai strait crossing tun-nel;4)Deep tunneling proposal consisting of“TBM bore +enlarging by drill and blast”should be adopted for Taiwan strait crossing tunnel.