遵循国家电网公司“两型一化”变电站设计建设导则,结合装配式智能变电站的建设,从比较装配式建筑外墙与传统砖砌外墙,以及装配式建筑外墙不同板材,分析了外墙体系的技术特点和经济性,以推动电网又快又好的建设。
遵循國傢電網公司“兩型一化”變電站設計建設導則,結閤裝配式智能變電站的建設,從比較裝配式建築外牆與傳統磚砌外牆,以及裝配式建築外牆不同闆材,分析瞭外牆體繫的技術特點和經濟性,以推動電網又快又好的建設。
준순국가전망공사“량형일화”변전참설계건설도칙,결합장배식지능변전참적건설,종비교장배식건축외장여전통전체외장,이급장배식건축외장불동판재,분석료외장체계적기술특점화경제성,이추동전망우쾌우호적건설。
This paper analyzes the technical and economic characteristics of the exterior wall system, which can promote the fast and sound construction of power grid,from the comparison of prefabricated building facades with traditional brick facades and the different plate prefabricated building facades com-bined with the construction of modular intelligent substation by following the substation design con-struction guiding principle of the “two types and one localization”.