为减少小净距重叠隧道爆破开挖对结构及中夹岩的不利影响,以重庆轨道交通6号线大龙山站—花卉园站区间重叠隧道(长约500 m)爆破开挖为依托,首先结合工程实际情况及相关施工经验,说明重叠段总体施工方案优选为“先上洞后下洞”的开挖方法,但需根据净距大小采用不同的施工措施;然后通过理论计算论证了上下间距较小时爆破开挖不能保证结构安全,需要采用减震爆破及非爆破的开挖技术,才能保证中厚层状岩最小净距重叠隧道“先上洞后下洞”开挖方法的实现。实施效果证明:对于中夹岩厚度小于3.5 m的最小净距地段(长约25 m),可先行开挖上洞上台阶,预留下台阶,并待后行下洞减震爆破通过后,再采用非爆破开挖预留的上洞下台阶,以完全消除爆破开挖对最小净距中夹岩的影响,确保了最小净距段结构及施工安全。
為減少小淨距重疊隧道爆破開挖對結構及中夾巖的不利影響,以重慶軌道交通6號線大龍山站—花卉園站區間重疊隧道(長約500 m)爆破開挖為依託,首先結閤工程實際情況及相關施工經驗,說明重疊段總體施工方案優選為“先上洞後下洞”的開挖方法,但需根據淨距大小採用不同的施工措施;然後通過理論計算論證瞭上下間距較小時爆破開挖不能保證結構安全,需要採用減震爆破及非爆破的開挖技術,纔能保證中厚層狀巖最小淨距重疊隧道“先上洞後下洞”開挖方法的實現。實施效果證明:對于中夾巖厚度小于3.5 m的最小淨距地段(長約25 m),可先行開挖上洞上檯階,預留下檯階,併待後行下洞減震爆破通過後,再採用非爆破開挖預留的上洞下檯階,以完全消除爆破開挖對最小淨距中夾巖的影響,確保瞭最小淨距段結構及施工安全。
위감소소정거중첩수도폭파개알대결구급중협암적불리영향,이중경궤도교통6호선대룡산참—화훼완참구간중첩수도(장약500 m)폭파개알위의탁,수선결합공정실제정황급상관시공경험,설명중첩단총체시공방안우선위“선상동후하동”적개알방법,단수근거정거대소채용불동적시공조시;연후통과이론계산론증료상하간거교소시폭파개알불능보증결구안전,수요채용감진폭파급비폭파적개알기술,재능보증중후층상암최소정거중첩수도“선상동후하동”개알방법적실현。실시효과증명:대우중협암후도소우3.5 m적최소정거지단(장약25 m),가선행개알상동상태계,예류하태계,병대후행하동감진폭파통과후,재채용비폭파개알예류적상동하태계,이완전소제폭파개알대최소정거중협암적영향,학보료최소정거단결구급시공안전。
Dalongshan-Huahuiyuan running tunnel on Line 6 of Chongqing Metro has a 500 m-long closely-spaced stacked tunnel section,which is located in medium-thick layered rocks.The blasting excavation of the stacked tunnel may have adverse impact on the tunnel structure,as well as on the rocks between the twin tunnel tubes.It is proposed that the upper tunnel tube should be excavated before the lower tunnel tube and that countermeasures should be taken according to the thickness of the rocks between the twin tunnel tubes.Theoretical calculations made shows that,for the twin tunnel tube section with thin rocks between the tunnel tubes,vibration-reducing blasting technology and non-blas-ting excavation technology should be adopted so as to ensure the safety of the tunnel structure.For the 25 m-long twin tunnel tube section with less than 3 .5 m-thick rock between the tunnel tubes,the top heading of the upper tunnel tube should be excavated,while the bench of the upper tunnel tube should be reserved;Then the lower tunnel tube is excava-ted by blasting means before the bench of the upper tunnel tube is excavated by non-blasting means,so as to minimize the adverse effect on the rocks between the twin tunnel tubes and,in the end,to ensure the safety of the tunnel structure and the tunneling activity.