应用概率极限状态设计方法是当今国内外结构设计发展的必然趋势。为了推进分项系数法在公路隧道结构设计中的应用,结合隧道结构和分项系数法的特点,针对不同的隧道建设工法及结构安全等级,提出各分项系数的取值建议,并对各分项系数进行经验校准。得到如下结论:1)当隧道结构安全等级为一级时,根据本文给出的分项系数的计算结果,结构的总体安全水平略高于传统设计方法;2)当结构安全等级为二级时,其总体安全水平与传统设计方法相当;3)安全等级为三级时比传统方法略低。建议推行基于结构可靠度理论的分项系数法。本文对隧道设计规范修编具有较大的参考价值。
應用概率極限狀態設計方法是噹今國內外結構設計髮展的必然趨勢。為瞭推進分項繫數法在公路隧道結構設計中的應用,結閤隧道結構和分項繫數法的特點,針對不同的隧道建設工法及結構安全等級,提齣各分項繫數的取值建議,併對各分項繫數進行經驗校準。得到如下結論:1)噹隧道結構安全等級為一級時,根據本文給齣的分項繫數的計算結果,結構的總體安全水平略高于傳統設計方法;2)噹結構安全等級為二級時,其總體安全水平與傳統設計方法相噹;3)安全等級為三級時比傳統方法略低。建議推行基于結構可靠度理論的分項繫數法。本文對隧道設計規範脩編具有較大的參攷價值。
응용개솔겁한상태설계방법시당금국내외결구설계발전적필연추세。위료추진분항계수법재공로수도결구설계중적응용,결합수도결구화분항계수법적특점,침대불동적수도건설공법급결구안전등급,제출각분항계수적취치건의,병대각분항계수진행경험교준。득도여하결론:1)당수도결구안전등급위일급시,근거본문급출적분항계수적계산결과,결구적총체안전수평략고우전통설계방법;2)당결구안전등급위이급시,기총체안전수평여전통설계방법상당;3)안전등급위삼급시비전통방법략저。건의추행기우결구가고도이론적분항계수법。본문대수도설계규범수편구유교대적삼고개치。
It is a worldwide inevitable trend to adopt probability limit state design method in the structure design.In order to promote the application of partial factor method in the structure design of highway tunnels,the authors make proposals on the partial factors,considering the characteristics of the tunnel structure and the partial factor method,as well as considering the tunnel construction method and the structure safety grade.The authors also make calibrations on these partial factors on basis of experiences.Conclusions drawn are as follows:1 )For tunnel structures with Grade I safety level,the total safety factor obtained by partial factor method is higher than that obtained by traditional design method;2)For tunnel structures with Grade II safety level,the total safety factor obtained by partial factor method is almost the same as that obtained by traditional design method;3 )For tunnel structures with Grade III safety level,the total safety factor obtained by partial factor method is slightly lower than that obtained by traditional design method.The authors propose that the partial factor method based on reliability theory should be adopted in the new standards, specifications and codes.The paper can provide reference for the revision of the tunnel design standards in the future.