红水河
紅水河
홍수하
HONGSHUI RIVER
2014年
3期
13-15
,共3页
庙林水电站%调压室%水力过渡过程
廟林水電站%調壓室%水力過渡過程
묘림수전참%조압실%수력과도과정
Miaolin hydropower station%surge shaft%hydraulic transition process
∶庙林水电站调压室为地下阻抗式,为大型地下洞室结构,开挖内径达21 m,室筒高75 m,顶拱地质条件较差,约1/2为IV类围岩。经对调压室施工、运行期进行有限元分析,最终取消了顶拱球冠的钢筋混凝土衬砌,采用锚喷支护,减小了施工难度,节约了工程投资。施工期及运行初期观测结果表明,调压室变形在合理范围内。
∶廟林水電站調壓室為地下阻抗式,為大型地下洞室結構,開挖內徑達21 m,室筒高75 m,頂拱地質條件較差,約1/2為IV類圍巖。經對調壓室施工、運行期進行有限元分析,最終取消瞭頂拱毬冠的鋼觔混凝土襯砌,採用錨噴支護,減小瞭施工難度,節約瞭工程投資。施工期及運行初期觀測結果錶明,調壓室變形在閤理範圍內。
∶묘림수전참조압실위지하조항식,위대형지하동실결구,개알내경체21 m,실통고75 m,정공지질조건교차,약1/2위IV류위암。경대조압실시공、운행기진행유한원분석,최종취소료정공구관적강근혼응토츤체,채용묘분지호,감소료시공난도,절약료공정투자。시공기급운행초기관측결과표명,조압실변형재합리범위내。
Miaolin hydropower station has a large underground impedance surge shaft, which requires an excavation diameter of 21m and shaft height of 75m. Its vault has poor geological conditions, about 50%of which is Class-IVsur-rounding rock. The reinforced concrete lining of the spherical vault was replaced by anchor-shotcrete support through finite element analysis on surge shaft in construction and running periods, which reduces the construction difficulty and saves the project investment. The results of observations during the construction and running periods show that the deformation of surge shaft is in reasonable limit.