无围堰%吹填%防污帷幕%环保
無圍堰%吹填%防汙帷幕%環保
무위언%취전%방오유막%배보
non-cofferdam%reclamation%silt curtain%environmental protection
详细介绍了在沙特扎瓦尔港口工程吹填施工中,进行无围堰水上吹填,并利用防污帷幕遮挡悬浮细颗粒物以满足环保要求,在围堰施工完成后,再进行补吹形成陆域的施工工艺。该工艺经过一年多的工程实践取得成功,大大延长了可吹填施工时间,并获得了显著的经济效益。
詳細介紹瞭在沙特扎瓦爾港口工程吹填施工中,進行無圍堰水上吹填,併利用防汙帷幕遮擋懸浮細顆粒物以滿足環保要求,在圍堰施工完成後,再進行補吹形成陸域的施工工藝。該工藝經過一年多的工程實踐取得成功,大大延長瞭可吹填施工時間,併穫得瞭顯著的經濟效益。
상세개소료재사특찰와이항구공정취전시공중,진행무위언수상취전,병이용방오유막차당현부세과립물이만족배보요구,재위언시공완성후,재진행보취형성륙역적시공공예。해공예경과일년다적공정실천취득성공,대대연장료가취전시공시간,병획득료현저적경제효익。
This paper describes the details of non-cofferdam reclamation method taken in Ras Al Khair Sea Port Project, Saudi Arabia. A silt curtain was set up around reclamation area to control suspended solid for environmental protection. Comple-mentary reclamation was carried out after the cofferdam was built to complete the whole reclamation area. This new method got great success after more than a year of engineering practice,increased construction period for reclamation works,and obtained remarkable economic benefits.