核电厂设备及管线保温装置普遍。随着机组运行时间增加,保温层下腐蚀(CUI)问题日益严峻。结合核电厂实际运行工况,针对保温层下腐蚀机理、监测技术及防腐措施进行调查研究,对在役核电厂解决CUI问题提出建议及方案。
覈電廠設備及管線保溫裝置普遍。隨著機組運行時間增加,保溫層下腐蝕(CUI)問題日益嚴峻。結閤覈電廠實際運行工況,針對保溫層下腐蝕機理、鑑測技術及防腐措施進行調查研究,對在役覈電廠解決CUI問題提齣建議及方案。
핵전엄설비급관선보온장치보편。수착궤조운행시간증가,보온층하부식(CUI)문제일익엄준。결합핵전엄실제운행공황,침대보온층하부식궤리、감측기술급방부조시진행조사연구,대재역핵전엄해결CUI문제제출건의급방안。
the equipment and pipelines insulation is widely used in the nuclear plant. With the operation time of the plant increased, Corrosion under insulation (CUI) is a swelling problem. Combined with the practical operation of plant and investigating the corrosion under insulation mechanism, monitoring technology and protecting measures, the suggestions and solutions are provided to solve CUI problems in the nuclear power plants.