后浇带%质量控制%设计%施工%监理
後澆帶%質量控製%設計%施工%鑑理
후요대%질량공제%설계%시공%감리
late poured band%quality control%design%construction%supervision
结合现行相关规范,就如何保证后浇带质量进行了探讨分析,分别从设计、施工、监理三方面入手提出了后浇带质量控制措施,以保证建筑结构中后浇带质量,满足工程质量要求。
結閤現行相關規範,就如何保證後澆帶質量進行瞭探討分析,分彆從設計、施工、鑑理三方麵入手提齣瞭後澆帶質量控製措施,以保證建築結構中後澆帶質量,滿足工程質量要求。
결합현행상관규범,취여하보증후요대질량진행료탐토분석,분별종설계、시공、감리삼방면입수제출료후요대질량공제조시,이보증건축결구중후요대질량,만족공정질량요구。
Combining with the current regulations, the study explores and analyzes how to guarantee the quality of the late poured bands, and points out the measures for the quality control of the late poured bands from the design, the construction, and the supervision, so as to ensure the quality of the late poured bands in the architectural structure and to meet the demands of the engineering quality.