连续梁转体施工在城市轨道交通中比较少见,无锡地铁1号线跨越沪宁高速公路,采用50m+80m+50m连续梁转体施工方案,较好地解决了桥梁施工对沪宁高速公路的影响。文章重点介绍连续梁转体施工的设计和施工工艺。
連續樑轉體施工在城市軌道交通中比較少見,無錫地鐵1號線跨越滬寧高速公路,採用50m+80m+50m連續樑轉體施工方案,較好地解決瞭橋樑施工對滬寧高速公路的影響。文章重點介紹連續樑轉體施工的設計和施工工藝。
련속량전체시공재성시궤도교통중비교소견,무석지철1호선과월호저고속공로,채용50m+80m+50m련속량전체시공방안,교호지해결료교량시공대호저고속공로적영향。문장중점개소련속량전체시공적설계화시공공예。
The continuous beam swinging construction in urban transit is relatively rare. For Wuxi metro Line 1 across the Shanghai-Nanjing expressway, 50 m +80 m +50 m continuous beam swinging construction method is used to reduce impact of the bridge construction on Shanghai- Nanjing expressway. The article focuses on the design and construction technology of the continuous beam swinging construction.