内蒙古公路与运输
內矇古公路與運輸
내몽고공로여운수
HIGHWAYS & TRANSPORTATION IN INNER MONGOLIA
2012年
2期
21-23
,共3页
水中墩%钢套箱%钢吊箱%钢板桩%施工
水中墩%鋼套箱%鋼弔箱%鋼闆樁%施工
수중돈%강투상%강조상%강판장%시공
water pier%steel sleeve box%steel hanging box%steel sheet pile%construction
水中施工因其隐蔽性、水流因素等带来的不稳定性,使水中施工方案的选定尤为重要。文章详细阐述了内蒙古临河黄河大桥各种水中施工方案,结合经济成本、质量控制、施工安全等方面分别采取了钢套箱、钢吊箱和钢板桩围堰等施工工艺。
水中施工因其隱蔽性、水流因素等帶來的不穩定性,使水中施工方案的選定尤為重要。文章詳細闡述瞭內矇古臨河黃河大橋各種水中施工方案,結閤經濟成本、質量控製、施工安全等方麵分彆採取瞭鋼套箱、鋼弔箱和鋼闆樁圍堰等施工工藝。
수중시공인기은폐성、수류인소등대래적불은정성,사수중시공방안적선정우위중요。문장상세천술료내몽고림하황하대교각충수중시공방안,결합경제성본、질량공제、시공안전등방면분별채취료강투상、강조상화강판장위언등시공공예。
Instability brought about by water construction because of its hidden nature, flow factor, selected water construction program is particularly important. The article elaborated on construction program in water of Yellow River Bridge in Linhe, Inner Mongolia, combined with economic costs, quality control, and construction safety and so on to take a steel sleeve box, steel hanging box and steel sheet pile cofferdam construction technology.