山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
16期
188-189
,共2页
宽幅%挂篮%研制%系统构造
寬幅%掛籃%研製%繫統構造
관폭%괘람%연제%계통구조
broad width%hanging basket%research%systematic components
以衡酃路A标湘江主桥连续梁工程为实例,探讨了宽幅箱梁悬臂挂篮研制过程,对挂篮类型的选择、总体构思、各系统构造等做了说明,为类似工程施工提供了一定的指导和借鉴。
以衡酃路A標湘江主橋連續樑工程為實例,探討瞭寬幅箱樑懸臂掛籃研製過程,對掛籃類型的選擇、總體構思、各繫統構造等做瞭說明,為類似工程施工提供瞭一定的指導和藉鑒。
이형령로A표상강주교련속량공정위실례,탐토료관폭상량현비괘람연제과정,대괘람류형적선택、총체구사、각계통구조등주료설명,위유사공정시공제공료일정적지도화차감。
Taking the continuous beam project along Section A of Xiangjiang Bridge along Hengling Road as the example,the study explores the research process for the hanging basket cantilevel beam of broad width box girders,and indicates the selection for the hanging basket types,the general ideas and the components of all systems,and provides some direction and reference for similar projects.