北京水务
北京水務
북경수무
BEIJING WATER
2012年
2期
48-50
,共3页
杨粟%朱敏%焦龙飞
楊粟%硃敏%焦龍飛
양속%주민%초룡비
接头管%防渗墙%南水北调
接頭管%防滲牆%南水北調
접두관%방삼장%남수북조
junction block cutoff wall the project of South-to-North water transfer
结合北京市南水北调配套工程大宁水库防渗墙的工程实例,对接头管施工工序、施工要点和施工中应该注意的问题进行阐述,论文成果对于类似工程的施工具有一定的指导意义。
結閤北京市南水北調配套工程大寧水庫防滲牆的工程實例,對接頭管施工工序、施工要點和施工中應該註意的問題進行闡述,論文成果對于類似工程的施工具有一定的指導意義。
결합북경시남수북조배투공정대저수고방삼장적공정실례,대접두관시공공서、시공요점화시공중응해주의적문제진행천술,논문성과대우유사공정적시공구유일정적지도의의。
The paper elaborates the procedures, main riced in the junction block construction with the example tion for the project of South-to-North water transfer. The structive to the construction of similar projects. points and the problems which should of Beijing Daning reservoir cutoff wall be no- contruc- experiences from aboved example will be in-