为了避免某铁路建成后因地基沉降过大引起铁路设备的损坏,研究决定采用钻孔注浆对该区域进行加固,在明确施工注意事项的基础上,论述了注浆施工工艺流程,对同类工程施工具有指导意义。
為瞭避免某鐵路建成後因地基沉降過大引起鐵路設備的損壞,研究決定採用鑽孔註漿對該區域進行加固,在明確施工註意事項的基礎上,論述瞭註漿施工工藝流程,對同類工程施工具有指導意義。
위료피면모철로건성후인지기침강과대인기철로설비적손배,연구결정채용찬공주장대해구역진행가고,재명학시공주의사항적기출상,논술료주장시공공예류정,대동류공정시공구유지도의의。
In order to avoid railway equipment damage owing to foundation subsidence after the railway completion,bored pouring is determined to use in the region for reinforcement.Based on identifying matters needing attention in construction,the paper discusses pouring construction technology procedure,which has guiding meaning for similar engineering construction.