为分析掌鸠河引水供水工程、清水海供水及水源环境管理项目供水工程、牛栏江-滇池补水工程等外流域引水工程建成后的滇池运行控制水位,基于滇池、海口河-螳螂川流域现状经济社会发展、长系列水文观测、供用耗排水等数据资料,采用径流还原、湖泊径流与洪水调节模拟等方法,经多方案比较确定滇池外海的正常高水位提高至1887.50 m,汛期限制水位提高至1887.20 m,在滇池泄洪通道和预报调度系统未达到设计标准前,汛期限制水位可降至1886.70 m运行;将外海自正常高水位以下依次划分为生态供(用)水区、工农业供水区、死水位区。研究结果表明,滇池从过去的调蓄供水水源转变成需进行生态修复补水的用水对象,将促使昆明城市及环湖周边高耗水行业转移到下游的海口-安宁地区,减少滇池水资源的一次性消耗量,削减入湖污染物,形成以水定发展的局面,从而实现工业布局的战略性调整。
為分析掌鳩河引水供水工程、清水海供水及水源環境管理項目供水工程、牛欄江-滇池補水工程等外流域引水工程建成後的滇池運行控製水位,基于滇池、海口河-螳螂川流域現狀經濟社會髮展、長繫列水文觀測、供用耗排水等數據資料,採用徑流還原、湖泊徑流與洪水調節模擬等方法,經多方案比較確定滇池外海的正常高水位提高至1887.50 m,汛期限製水位提高至1887.20 m,在滇池洩洪通道和預報調度繫統未達到設計標準前,汛期限製水位可降至1886.70 m運行;將外海自正常高水位以下依次劃分為生態供(用)水區、工農業供水區、死水位區。研究結果錶明,滇池從過去的調蓄供水水源轉變成需進行生態脩複補水的用水對象,將促使昆明城市及環湖週邊高耗水行業轉移到下遊的海口-安寧地區,減少滇池水資源的一次性消耗量,削減入湖汙染物,形成以水定髮展的跼麵,從而實現工業佈跼的戰略性調整。
위분석장구하인수공수공정、청수해공수급수원배경관리항목공수공정、우란강-전지보수공정등외류역인수공정건성후적전지운행공제수위,기우전지、해구하-당랑천류역현상경제사회발전、장계렬수문관측、공용모배수등수거자료,채용경류환원、호박경류여홍수조절모의등방법,경다방안비교학정전지외해적정상고수위제고지1887.50 m,신기한제수위제고지1887.20 m,재전지설홍통도화예보조도계통미체도설계표준전,신기한제수위가강지1886.70 m운행;장외해자정상고수위이하의차화분위생태공(용)수구、공농업공수구、사수위구。연구결과표명,전지종과거적조축공수수원전변성수진행생태수복보수적용수대상,장촉사곤명성시급배호주변고모수행업전이도하유적해구-안저지구,감소전지수자원적일차성소모량,삭감입호오염물,형성이수정발전적국면,종이실현공업포국적전략성조정。
In order to analyze the water level of Dianchi Lake after the construction of several inter-basin water diversion projects, including the Zhangjiu River Water Diversion and Supply Project, the water supply project of the Qingshuihai Lake Water Supply and Water Sources Management Project, and the Water Diversion Project from the Niulanjiang River to Dianchi Lake, data from the investigation of current social and economic development, long-term hydrological observation data series, and water supply, utilization, consumption, and drainage data series from the Dianchi Basin and the Haikouhe-Tanglangchuan Basin were collected. Then, the runoff reduction method and a simulation method for lake runoff and flood regulation were adopted. Through comparison of multiple schemes, reasonable values of the water level of Dianchi Lake were determined as follows:the normal pool level was set to 1 887.50 m, and the limiting level during the flood season was set to 1 887.20 m. Unless the spillway of Dianchi Lake and the forecast and operation system are built, the limiting level during flood season should not exceed 1 886.70 m during operation. The areas in the outer lakes of Dianchi Lake with a water level beneath the normal pool level were divided into the ecological water supply ( utilization) area, the industrial and agricultural water supply area, and the dead storage area. The results show that Dianchi Lake has changed from a former water supply source into a water body that has to be supplemented with water for ecological rehabilitation, and that the high water consumption industry in Kunming City and areas around Dianchi Lake has to be moved to the downstream Haikou-Anning area in order to reduce the consumption of water resources in Dianchi Lake and the contaminants into the lake. Therefore, the social and economic development will be guided by the water resources situation, and the strategic adjustment of the industrial layout will be achieved.