研制了新型大容量直流融冰兼静止无功补偿器(SVC)装置。与小容量直流融冰装置相比,大容量直流融冰兼SVC装置具有以下特点:设备容量较大且具有SVC功能,一次结构上采用2台三绕组换流变压器,高压侧从高压电网直接受电,中压侧连接交流滤波器组,低压侧连接晶闸管阀组;通过14组三相电动隔离开关的位置变换和控制保护系统的功能切换,实现了融冰和SVC运行模式之间的自动切换,可尽量避免人工参与;由于设备应用场合重要性更高且需要长期运行,控制保护系统采用了双系统冗余配置,提高了设备的可靠性。现场应用表明,大容量直流融冰兼SVC装置在融冰模式运行时可有效解决大线径、长距离超高压线路的覆冰问题;在SVC模式运行时可有效提高电网电压的支撑能力。
研製瞭新型大容量直流融冰兼靜止無功補償器(SVC)裝置。與小容量直流融冰裝置相比,大容量直流融冰兼SVC裝置具有以下特點:設備容量較大且具有SVC功能,一次結構上採用2檯三繞組換流變壓器,高壓側從高壓電網直接受電,中壓側連接交流濾波器組,低壓側連接晶閘管閥組;通過14組三相電動隔離開關的位置變換和控製保護繫統的功能切換,實現瞭融冰和SVC運行模式之間的自動切換,可儘量避免人工參與;由于設備應用場閤重要性更高且需要長期運行,控製保護繫統採用瞭雙繫統冗餘配置,提高瞭設備的可靠性。現場應用錶明,大容量直流融冰兼SVC裝置在融冰模式運行時可有效解決大線徑、長距離超高壓線路的覆冰問題;在SVC模式運行時可有效提高電網電壓的支撐能力。
연제료신형대용량직류융빙겸정지무공보상기(SVC)장치。여소용량직류융빙장치상비,대용량직류융빙겸SVC장치구유이하특점:설비용량교대차구유SVC공능,일차결구상채용2태삼요조환류변압기,고압측종고압전망직접수전,중압측련접교류려파기조,저압측련접정갑관벌조;통과14조삼상전동격리개관적위치변환화공제보호계통적공능절환,실현료융빙화SVC운행모식지간적자동절환,가진량피면인공삼여;유우설비응용장합중요성경고차수요장기운행,공제보호계통채용료쌍계통용여배치,제고료설비적가고성。현장응용표명,대용량직류융빙겸SVC장치재융빙모식운행시가유효해결대선경、장거리초고압선로적복빙문제;재SVC모식운행시가유효제고전망전압적지탱능력。
A new large-capacity DC deicer/static var compensator(SVC) is developed.Compared with small-capacity DC deicer,it has many characteristics.Because of large capacity and static var compensation,the device contains two 3-winding converter transformers.High-voltage side of the transformers is powered directly from the high voltage grid,mid-voltage side is connected with AC filter banks,and the low-voltage side is connected with thyristor valves.Because of large size of equipment parts,automatic switching function is achieved between deicing and SVC operation mode by changing the position of 14 3-phase electric switches and switching control and protection functions,to avoid human intervention.Because the devices are connected with high operational importance,and the long operating time,the control and protection system is designed to use dual-redundant configuration so as to improve the overall reliability.Field application indicates that when large-capacity DC deicer/SVC operates in deicing mode,it can solve the ice-clad problems of the large diameter,long-distance extra-high voltage(EHV) line effectively.When it operates in SVC mode,it can improve the supporting ability of grid voltage effectively.