运营桥梁%独柱墩%加固%支座安装
運營橋樑%獨柱墩%加固%支座安裝
운영교량%독주돈%가고%지좌안장
running bridge%single column pier%reinforcement%bearing installation
结合杭长高速公路泗安枢纽3号桥独柱墩加固工程的施工,详细介绍了运营通车情况下独柱墩现浇箱梁桥增设支座加固施工的工艺和方法,总结了施工中的控制要点及注意事项,为今后类似工程施工提供了参考。
結閤杭長高速公路泗安樞紐3號橋獨柱墩加固工程的施工,詳細介紹瞭運營通車情況下獨柱墩現澆箱樑橋增設支座加固施工的工藝和方法,總結瞭施工中的控製要點及註意事項,為今後類似工程施工提供瞭參攷。
결합항장고속공로사안추뉴3호교독주돈가고공정적시공,상세개소료운영통차정황하독주돈현요상량교증설지좌가고시공적공예화방법,총결료시공중적공제요점급주의사항,위금후유사공정시공제공료삼고。
Combining with single column pier reinforcement engineering construction of Si' an hub 3# on Hang-Chang highway, the paper intro- duces the construction technology and methods of increasing bearing reinforcement of single column pier of east-in-situ box girder bridge under the condition of bridge running, and summarizes construction control points and matters needing attention, which has provide certain reference for similar enganeenng construction in future.